| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Sampling services
|
Provide document with link of the study dashboard with accessible de-identified summary study data. ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide document with link of the study dashboard with accessible de-identified summary study data.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Publish the dashboard to the study website.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 8 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide a document with summary statistics of the UV measures collected from the firefighters.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide a document with summary statistics of the UV measures collected from the firefighters.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Enroll 20 firefighters that will collect UV light exposure both at work and outside of work.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 8 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide a document with summary statistics of enrolled firefighter participants and summary statisti...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide a document with summary statistics of enrolled firefighter participants and summary statistics of study findings.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Enroll 100 Florida firefighters with repeated measures of toenail samples for heavy metal analysis.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 8 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide tabulated descriptive statistics and summary study results of firefighter enrolled in the re...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide tabulated descriptive statistics and summary study results of firefighter enrolled in the respiratory study.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Enrolled 100 firefighters in the Direct Respiratory Assessment of Firefighter Tactics (DRAFT) Cohort Study respiratory study.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 8 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide tabulated descriptive statistics of tumors collected during the observation period.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide tabulated descriptive statistics of tumors collected during the observation period.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Recruit 5 new tumor samples in the Florida firefighter Tumor Bank.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 8 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide summary statistics of the newly recruited firefighters.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide summary statistics of the newly recruited firefighters.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Recruit and enroll 100 new Florida firefighters into the FIRE cohort study.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 8 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide abstract(s) of the submitted manuscript(s).
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide abstract(s) of the submitted manuscript(s).
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Environmental Sampling Program, Prepare and submit manuscript(s) for publication in peer reviewed journals.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 7 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide a list and details of integration changes made to the sensors.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide a list and details of integration changes made to the sensors.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Environmental Sampling Program, Improve the integration of real time sensing that aligns with the firefighters’ requirements.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 7 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide report on findings of polyaromatic hydrocarbons exposure (PAH) exposure assessment in urine ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide report on findings of polyaromatic hydrocarbons exposure (PAH) exposure assessment in urine samples.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Environmental Sampling Program ,Assess polyaromatic hydrocarbons exposure (PAH) exposure in urine samples of different firefighting subgroups.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 7 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide report on findings of cytotoxicity studies.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide report on findings of cytotoxicity studies.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Environmental Sampling Program, Employ identified methods to evaluate toxicity of aqueous film-forming firefighting foams in vitro which may contain compounds such as PFAS.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 7 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide report on preparation and characterization of the new materials for sampling.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide report on preparation and characterization of the new materials for sampling.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Environmental Sampling Program, Produce protocols for developing polymers in-house with improved porosity and sorption characteristics for selective and efficient sampling. Pilot preparation of polymers for the novel sampling devices.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 7 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide results on analysis of samples.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide results on analysis of samples.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Environmental Sampling Program, Test PFAS derivatization method for analysis of PFAS in samples obtained from exposed firefighters and compare with laboratory spiked samples using GC-MS.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 7 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide a manuscript formatted for submission to a peer reviewed journal.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide a manuscript formatted for submission to a peer reviewed journal.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Prepare a manuscript describing skin cancer and risk among career and volunteer firefighters.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 7 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide a table characterizing the histologies of the most common cancer sites among firefighters an...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide a table characterizing the histologies of the most common cancer sites among firefighters and the Florida general population with cancer.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Evaluate histological differences in firefighter cancers compared to the Florida general population with cancer.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide a manuscript formatted for submission to a peer reviewed journal.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide a manuscript formatted for submission to a peer reviewed journal.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Prepare a manuscript detailing mortality risk in career Florida firefighters.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide demographic information of women firefighter participants.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide demographic information of women firefighter participants.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: FLORIDA firefighters Women’s COHORT, Distribute women’s firefighter cancer survey.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide evaluation of FCI decontamination bucket initiative.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide evaluation of FCI decontamination bucket initiative.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Program Evaluation, Evaluate FCI decontamination bucket initiative.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide evaluation of FCI Cancer Prevention Education Program.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide evaluation of FCI Cancer Prevention Education Program.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Program Evaluation, Evaluate FCI Cancer Prevention Education Program.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide copy of educational materials.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide copy of educational materials.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Cancer Prevention Education Program, Create and distribute cancer educational materials for firefighters.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide demographic information of firefighter participants.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide demographic information of firefighter participants.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Cancer Prevention Education Program, Launch online educational program throughout State of Florida.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide demographic information of firefighter participants.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide demographic information of firefighter participants.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Cancer Survivorship Program, Collect survey data from firefighter cancer patients currently going through treatment.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide demographic information of firefighter participants.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide demographic information of firefighter participants.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Cancer Survivorship Program, Recruit and enroll firefighter cancer survivors in Phase II intervention.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide demographic information of firefighter participants.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide demographic information of firefighter participants.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Cancer Survivorship Program, Recruit and enroll firefighter cancer survivors in Phase I intervention.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide documentation of number of locations FCI mobile unit has been utilized and number of partici...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide documentation of number of locations FCI mobile unit has been utilized and number of participants seen by FCI clinical team.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Cancer Prevention and Wellness Clinic, Launch FCI mobile health clinic in South Florida.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 6 |
| Deliverable Number: |
|
|
|
|
Sampling services
|
Provide demographic information of firefighters seen by UM FCI clinical team.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide demographic information of firefighters seen by UM FCI clinical team.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Cancer Prevention and Wellness Clinic, Facilitate firefighter access to cancer education, research, and screenings.
|
| Financial Consequences: Period 2 Deliverable: If one (1) or more of the twenty-eight (28) tasks in Period 2
Deliverable is not 100% complete, the total fixed price in the amount of
$1,000,000.00 will be reduced in proportion to the number of tasks that are
incomplete. For example, if two (2) of the tasks are not complete, a reduction in
the amount of $1,000,000.00 X 2/28 will be made from the Period 2 Deliverable
fixed price.
|
| Source Documentation Page Reference: Attachment 1 Page 5 |
| Deliverable Number: |
|