Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Water testing services
|
CO5: Add automatic soleniod valve and vacuum breaker to backwash system for refilling holding tanks....
|
Fixed Price - Lump Sum
|
| Major Deliverable: CO5: Add automatic soleniod valve and vacuum breaker to backwash system for refilling holding tanks.
|
| Deliverable Price: $1,649.90 |
| Non Price Justification: |
| Performance Metrics: CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values.
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Page 1, CO5 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
CO3: Building Bypass at Filters: 3" Butterly Valve, 2-3" Vanstone Flanges, 2-3" Tees, schedule 80, 2...
|
Fixed Price - Lump Sum
|
| Major Deliverable: CO3: Building Bypass at Filters: 3" Butterly Valve, 2-3" Vanstone Flanges, 2-3" Tees, schedule 80, 2-3" Bolt and Gasket Kit, 4 hours of Labor.
|
| Deliverable Price: $727.03 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Page 1, CO3 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
CO4: Electrical scope of work included: Install 2 four-foot LED vapor proof light fixtures in center...
|
Fixed Price - Lump Sum
|
| Major Deliverable: CO4: Electrical scope of work included: Install 2 four-foot LED vapor proof light fixtures in center of roof structure with switch to be located at panel. Install conduit and wire for lighting. Install lightning arrestor on panel. Install phase monitor at control panel to protect the motors from phase loss.
|
| Deliverable Price: $4,640.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Page 1, CO4 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Change Order No. 1 - Electrical Service Upgrade
|
Fixed Price - Lump Sum
|
| Major Deliverable: Change Order No. 1 - Electrical Service Upgrade |
| Deliverable Price: $5,700.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values. |
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Page 1, CO1 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
CO2: Install Swing Bolt Filter Housing, 20 Micron Fileter Cartridge and 2 hours of Labor.
|
Fixed Price - Lump Sum
|
| Major Deliverable: CO2: Install Swing Bolt Filter Housing, 20 Micron Fileter Cartridge and 2 hours of Labor. |
| Deliverable Price: $4,170.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Page 1, CO2 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Install Hydrogen Peroxide Feed System: CONTRACTOR shall comply with the requirements of Section 1119...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Install Hydrogen Peroxide Feed System: CONTRACTOR shall comply with the requirements of Section 11192 (2.1) of Exhibit B, Technical Specifications, and Exhibit C, Engineering Drawings. DUE DATE: This deliverable must be completed within 120 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $3,300.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2, Page 32 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Connect GAC Filters to Existing Water System: CONTRACTOR shall comply with the requirements of Secti...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Connect GAC Filters to Existing Water System: CONTRACTOR shall comply with the requirements of Section 11362 of Exhibit B, Technical Specifications, and Exhibit C, Engineering Drawings. DUE DATE: This deliverable must be completed within 30 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $11,000.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 34 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Install a 20 gpm Tank Recycle Pump and 20 gpm UV light:CONTRACTOR shall comply with the requirements...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Install a 20 gpm Tank Recycle Pump and 20 gpm UV light:CONTRACTOR shall comply with the requirements of Sections 11197 and 11285 of Exhibit B, Technical Specifications, and Exhibit C, Engineering Drawings. DUE DATE: This deliverable must be completed within 30 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $34,100.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $150 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 34 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Install a Backwash Collection System: CONTRACTOR shall comply with the requirements of Sections 1136...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Install a Backwash Collection System: CONTRACTOR shall comply with the requirements of Sections 11365, 11197, and 11285 of Exhibit B, Technical Specifications, and Exhibit C, Engineering Drawings. DUE DATE: This deliverable must be completed within 30 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $25,960.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values.
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $100 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 33 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Concrete Slab and Pole Barn for GAC Filter, Ion Exchange, Back Wash Collection and Recirculation Sys...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Concrete Slab and Pole Barn for GAC Filter, Ion Exchange, Back Wash Collection and Recirculation System, etc. CONTRACTOR shall comply with the requirements of Sections 02360 and 02365 of Exhibit B, Technical Specifications, and Exhibit C, Engineering Drawings. DUE DATE: This deliverable must be completed within 120 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $59,400.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $150 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 33 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Relocate Construct Sodium Hypochlorite Injection: CONTRACTOR shall comply with the requirements of S...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Relocate Construct Sodium Hypochlorite Injection: CONTRACTOR shall comply with the requirements of Sections 11192 (2.2) of Exhibit B, Technical Specifications, and Exhibit C, Engineering Drawings. DUE DATE: This deliverable must be completed within 120 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $3,300.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 32 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Install four (4) Granulated Activated Carbon (GAC) Filter with backwash: CONTRACTOR shall comply wit...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Install four (4) Granulated Activated Carbon (GAC) Filter with backwash: CONTRACTOR shall comply with the requirements of Sections 11362 and 02600 of Exhibit B, Technical Specifications, and Exhibit C, Engineering Drawings. DUE DATE: This deliverable must be completed within 120 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $89,650.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $450 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 31 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Project Record Documents and Technical Operations Manual:CONTRACTOR shall comply with the requiremen...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Project Record Documents and Technical Operations Manual:CONTRACTOR shall comply with the requirements of Sections 01300 (1.6 and 1.7), 01700, 01720, 13027, 15153, and 16622 of Exhibit B, Technical Specifications. DUE DATE: This deliverable must be completed within 120 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $11,000.00 |
| Non Price Justification: |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 31 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Intentionally Omitted
|
Fixed Price - Lump Sum
|
| Major Deliverable: Intentionally Omitted |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: "CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values."
|
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 30 |
| Deliverable Number: |
|
|
|
|
Water testing services
|
Mobilization:CONTRACTOR shall comply with the requirements of Section 2 of Attachment 2, Statement o...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Mobilization:CONTRACTOR shall comply with the requirements of Section 2 of Attachment 2, Statement of Work, and Sections 01300 (1.1 through 1.3) and 01505 of Exhibit B, Technical Specifications. DUE DATE: This deliverable must be completed within 30 days from the CONTRACTOR’S receipt of the Notice to Proceed.
|
| Deliverable Price: $62,000.00 |
| Non Price Justification: |
| Performance Metrics: CONTRACTOR will complete the tasks in accordance with the requirements described in the task. Each task must be signed off and approved by the ENGINEER and the OWNER’S Contract Manager.
Evidence of any required documents or documentation must be submitted and approved by the OWNER’S Contract Manager. All documents must be submitted for payment processing as specified in the Schedule of Values. |
| Financial Consequences: Failure to complete all specified tasks by the due date will result in a $50 reduction for each business day beyond the due date. Such reduction shall be made from the deliverable payment in the Schedule of Values.
|
| Source Documentation Page Reference: Attachment 2 Page 30 |
| Deliverable Number: |
|