Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
P1-01
|
Sampling services
|
Cancer Epi Surveillance: Develop plan to update cancer incidence and mortality data beyond 2014 to r...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Cancer Epi Surveillance: Develop plan to update cancer incidence and mortality data beyond 2014 to reflect modern exposures. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of plan to update cancer incidence and mortality beyond 2014.Proof of mortality data request from Florida Vital Statistics for 1990–2024, to assist in assessing time at risk for all active firefighters in Florida.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price. |
| Source Documentation Page Reference: SOW Page 1 and Exhibit 1 |
| Deliverable Number: P1-01 |
|
|
|
P1-02
|
Sampling services
|
Cancer Epi Surveillance: Establish a prospective contact study with all firefighters in the state wh...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Cancer Epi Surveillance: Establish a prospective contact study with all firefighters in the state who are diagnosed with cancer, identified through FCDS within three years of diagnosis, to assess past medical history and firefighter exposures, and to create a tumor bank for these cases.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Proof of protocol submission to the SCCC Population Science Group, Final submission to PRMC, Initiation of prospective contact study application within the DREAMS platform of FCDS.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Page 1 and Exhibit 1 |
| Deliverable Number: P1-02 |
|
|
|
P1-03
|
Sampling services
|
Cancer Epi Surveillance: Expand the Florida Firefighter Cancer Linkage Study by establishing firefig...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Cancer Epi Surveillance: Expand the Florida Firefighter Cancer Linkage Study by establishing firefighter occupation cohort linkages with other state and county cancer registries.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Documentation of meetings and agreements with additional state and county registries. Identification of academic partners and firefighter organizations to support implementation in at least two new states/counties.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Page 1 and Exhibit 1 |
| Deliverable Number: P1-03 |
|
|
|
P1-04
|
Sampling services
|
Prospective Cohorts: FIRE Cohort Study: Create a plan to follow up with firefighter currently enrol...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Prospective Cohorts: FIRE Cohort Study: Create a plan to follow up with firefighter currently enrolled in the FIRE Cohort study. (Caban)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide plan for follow up with FIRE cohort participants.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Page 1 and Exhibit 1 |
| Deliverable Number: P1-04 |
|
|
|
P1-05
|
Sampling services
|
Prospective Cohorts: FIRE Cohort Study: Create a plan to enrolled one new fire department into the ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Prospective Cohorts: FIRE Cohort Study: Create a plan to enrolled one new fire department into the FIRE Cohort study. (Caban)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide plan for new enrollment of fire departments in FIRE Cohort.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 and Exhibit 1 |
| Deliverable Number: P1-05 |
|
|
|
P1-06
|
Sampling services
|
Prospective Cohorts: Health, Exposure & Reproduction (HER) Occupational Investigation of a Statewid...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Prospective Cohorts: Health, Exposure & Reproduction (HER) Occupational Investigation of a Statewide Examination of Florida Women Firefighters Cohort Study: Create a plan to recruit and enroll women firefighters into the cohort. (Solle)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide recruitment and enrollment plan of FL women firefighters into HER Cohort.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 and Exhibit 1 |
| Deliverable Number: P1-06 |
|
|
|
P1-07
|
Sampling services
|
Prospective Cohorts: WISER Cohort Study: Create a plan to collect surveys, biological and environme...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Prospective Cohorts: WISER Cohort Study: Create a plan to collect surveys, biological and environmental samples from wildland firefighters through the Wildland Firefighters Investigation of Screening Practices, Exposures & Biomonitoring Risk (WISER) Cohort Study. (Caban)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide plan for recruitment, enrollment and data collection of wildland firefighters into WISER cohort.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 and Exhibit 1 |
| Deliverable Number: P1-07 |
|
|
|
P1-08
|
Sampling services
|
Personal Exposure Reporter: Conduct data cleaning of all PER reports and incidents.
|
Fixed Price - Lump Sum
|
| Major Deliverable: Personal Exposure Reporter: Conduct data cleaning of all PER reports and incidents.
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide report on data abstraction from the PER application.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-08 |
|
|
|
P1-09
|
Sampling services
|
Analyze PAHs exposures in various FCI cohorts through environmental sampling and biomonitoring. (Dau...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Analyze PAHs exposures in various FCI cohorts through environmental sampling and biomonitoring. (Daunert)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide summary of results.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-09 |
|
|
|
P1-10
|
Sampling services
|
Analysis of per- and polyfluoroalkyl substances (PFAS) in biological and environmental samples of fi...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Analysis of per- and polyfluoroalkyl substances (PFAS) in biological and environmental samples of fire service personnel within established FCI cohorts. (Daunert)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide summary of results.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-10 |
|
|
|
P1-11
|
Sampling services
|
Analyze contaminants and/or microbial biomarkers present on vaginal swabs collected from female fir...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Analyze contaminants and/or microbial biomarkers present on vaginal swabs collected from female firefighters from the HER cohort. (Daunert)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide summary of results.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-11 |
|
|
|
P1-12
|
Sampling services
|
Develop protocol for wearable particulate sensors during firefighter training events. (Biswas)
|
Fixed Price - Lump Sum
|
| Major Deliverable: Develop protocol for wearable particulate sensors during firefighter training events. (Biswas)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-12 |
|
|
|
P1-13
|
Sampling services
|
Develop protocol for the use of wipes to reduce heavy metal exposure. (Dhar)
|
Fixed Price - Lump Sum
|
| Major Deliverable: Develop protocol for the use of wipes to reduce heavy metal exposure. (Dhar)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-13 |
|
|
|
P1-14
|
Sampling services
|
Modify tumor bank protocol and update survey. (Kobetz)
|
Fixed Price - Lump Sum
|
| Major Deliverable: Modify tumor bank protocol and update survey. (Kobetz)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-14 |
|
|
|
P1-15
|
Sampling services
|
Develop protocol for biospecimen repository to support ongoing and future research. (Kobetz)
|
Fixed Price - Lump Sum
|
| Major Deliverable: Develop protocol for biospecimen repository to support ongoing and future research. (Kobetz)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-15 |
|
|
|
P1-16
|
Sampling services
|
Heavy Metals: Develop protocol for examining halon and metal burden via biospecimens and linking the...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Heavy Metals: Develop protocol for examining halon and metal burden via biospecimens and linking them to oxidative stress and mitochondrial damage. (Lombard)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-16 |
|
|
|
P1-17
|
Sampling services
|
Heavy Metals: Draft protocol for investigating chronic exposures and metabolic and epigenetic homeos...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Heavy Metals: Draft protocol for investigating chronic exposures and metabolic and epigenetic homeostasis. (Telonis)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-17 |
|
|
|
P1-18
|
Sampling services
|
Heavy Metals: Draft protocol for exploring UPR stress pathways as predictors of toxicity and sensiti...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Heavy Metals: Draft protocol for exploring UPR stress pathways as predictors of toxicity and sensitivity to platinum and cadmium exposures using PDX models. (Verdun)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-18 |
|
|
|
P1-19
|
Sampling services
|
Heavy Metals: Draft protocol for multi-generational study using zebrafish. (Shelton)
|
Fixed Price - Lump Sum
|
| Major Deliverable: Heavy Metals: Draft protocol for multi-generational study using zebrafish. (Shelton)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-19 |
|
|
|
P1-20
|
Sampling services
|
Develop plan to assess the prevalence of MGUS in biospecimens collected from active firefighters to ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Develop plan to assess the prevalence of MGUS in biospecimens collected from active firefighters to better understand early markers of cancer risk (Landgren)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-20 |
|
|
|
P1-21
|
Sampling services
|
Describe the blood samples used and quantification results of somatic mutation detected in firefight...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Describe the blood samples used and quantification results of somatic mutation detected in firefighter blood samples. (Taylor)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide summary of results.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-21 |
|
|
|
P1-22
|
Sampling services
|
FIREPROOF Trial: Create a plan to evaluate the impact of oral supplements on reducing blood PFAS lev...
|
Fixed Price - Lump Sum
|
| Major Deliverable: FIREPROOF Trial: Create a plan to evaluate the impact of oral supplements on reducing blood PFAS levels in firefighters in the FIREfighter Prebiotic and Reduction of Occupational Organofluorine Fate (FIREPROOF) trial. (Caban)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide plan on the evaluation of oral supplements on PFAS levels in firefighters.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-22 |
|
|
|
P1-23
|
Sampling services
|
Develop protocol and survey evaluating chemotherapy-induced peripheral neuropathy. (Pizzolato)
|
Fixed Price - Lump Sum
|
| Major Deliverable: Develop protocol and survey evaluating chemotherapy-induced peripheral neuropathy. (Pizzolato)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide copy of the protocol.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-23 |
|
|
|
P1-24
|
Sampling services
|
Cancer Education: Train fire service partners on cancer prevention education and delivery to their m...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Cancer Education: Train fire service partners on cancer prevention education and delivery to their members. (Solle)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide outline of education curriculum delivered to FF partners
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-24 |
|
|
|
P1-25
|
Sampling services
|
Cancer Education: Deliver cancer prevention curriculum to 2 fire departments. (Solle)
|
Fixed Price - Lump Sum
|
| Major Deliverable: Cancer Education: Deliver cancer prevention curriculum to 2 fire departments. (Solle)
|
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Provide demographics of participating firefighters.
|
| Financial Consequences: Period 1 Deliverable: If one (1) or more of the thirty-six (36) tasks in Period 1 Deliverable is not 100% complete, the total fixed price in the amount of $1,750,000.00 will be reduced in proportion to the number of tasks that are incomplete. For example, if two (2) of the tasks are not complete, a reduction in the amount of $1,750,000.00 x 2/36 will be made from the Period 1 Deliverable fixed price.
|
| Source Documentation Page Reference: SOW Pg 1 |
| Deliverable Number: P1-25 |
|