More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Amend 7 - (16) Feb 28, 2013 - Addition of work tasks related to increase in the per student quantity...
|
No Cost
|
Major Deliverable: Amend 7 - (16) Feb 28, 2013 - Addition of work tasks related to increase in the per student quantity of work folders for Grade 5 mathematics & tracking of first time vs. retake students for all EOC assessments. No charge for this additional requirement |
Deliverable Price: $0.00 |
Non Price Justification: Agreement without a financial exchange or impact |
Performance Metrics: Amend 7 adds work tasks related to increase in the per student quantity of work folders for Grade 5 mathematics & tracking of first time vs. retake students for all EOC assessments. No charge for this additional requirement |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amendment 7, Attachment A Items 1 & 2 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Amend 7 - (17) May 31, 2013 - Addition of work tasks related to tracking of first time vs. retake s...
|
No Cost
|
Major Deliverable: Amend 7 - (17) May 31, 2013 - Addition of work tasks related to tracking of first time vs. retake students for all EOC assessments. No charge for this additional requirement. |
Deliverable Price: $0.00 |
Non Price Justification: Agreement without a financial exchange or impact |
Performance Metrics: Amend 7 adds work tasks related to tracking of first time vs. retake students for all EOC assessments. No charge for this additional requirement. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amendment 7, Attachment A Item 2 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Amend 7 - (18) Aug 31, 2013 - Addition of work tasks related to tracking of first time vs. retake s...
|
No Cost
|
Major Deliverable: Amend 7 - (18) Aug 31, 2013 - Addition of work tasks related to tracking of first time vs. retake students for all EOC assessments. No charge for this additional requirement. |
Deliverable Price: $0.00 |
Non Price Justification: Agreement without a financial exchange or impact |
Performance Metrics: Amend 7 adds work tasks related to tracking of first time vs. retake students for all EOC assessments. No charge for this additional requirement. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amendment 7, Attachment A Item 2 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Amend 7 - (19) Nov 30, 2013 - Addition of work tasks related to tracking of first time vs. retake s...
|
No Cost
|
Major Deliverable: Amend 7 - (19) Nov 30, 2013 - Addition of work tasks related to tracking of first time vs. retake students for all EOC assessments. No charge for this additional requirement. |
Deliverable Price: $0.00 |
Non Price Justification: Agreement without a financial exchange or impact |
Performance Metrics: Amend 7 adds work tasks related to tracking of first time vs. retake students for all EOC assessments. No charge for this additional requirement. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amendment 7, Attachment A Item 2 |
Deliverable Number: |
|
|
|
Educational advisory services
|
Payment 23: Program management•Reimbursables documentation•Technology and Product management•Test an...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Payment 23: Program management•Reimbursables documentation•Technology and Product management•Test and Measurement services•Meetings documentation. AMEND 11: Adds to tasks of Technology and Project Management; to include updates to the accommodated computer-based test software (TestHear) to include single Text to Speech Voice as part of the software package as specified in Attachment A. AMEND 12: Increase in the amount of $144,395 for the addition of a Fall 2014 Mathematics retake. Overall deliverable increase from $9,375,738 to $9,520,133. AMEND 13: Increase in the amount of $12,972, $6,920, and $6486 for the addition of OIPPs as specified in Exhibit 1. Overall deliverable increase from $9,520,133 to $9,546,511. AMEND 14/EXT 1: Overall deliverable decrease from $9,546,511 to $5,830,383. Tasks de-scopes as follows: Program management - decrease of $522,369; Reimbursables documentation - decrease of $76,271; Technology and product management – decrease of $439,546; Test and measurement services - decrease of $ 265,963; Meetings documentation – decrease of $210,939; Winter EOCs, - decrease of $ 107,461; Winter FCAT 2.0 Reading and Mathematics tasks – decrease of $ 1,221,693; and FCAT 2.0 Writing tasks – decrease of $ 871,885. |
Deliverable Price: $5,830,383.00 |
Non Price Justification: |
Performance Metrics: Fall EOCs, including Test development, Technology and product management, Printed products/CBT tests, Packaging, distribution, and processing, Scoring and reporting • Fall Retake, including Test development, Technology and product management, Printed products/CBT tests, Packaging, distribution, and processing, Scoring and reporting•Winter EOCs, including Test development, Technology and product management, Printed products/CBT tests•FCAT 2.0 Reading and Mathematics, including Technology and product management, Printed products/CBT tests, Scoring and reporting• FCAT 2.0 Science, including Technology and product management, Printed tests,Scoring and reporting•FCAT 2.0 Writing, including Technology and product management, Printed products/CBT tests•Summer EOCs, including Technology and product management, Scoring and reporting
|
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amend 14/Extension 1, Pages 1-8 |
Deliverable Number: |
|
|
|
Educational advisory services
|
Payment 24: Program management•Reimbursables documentation•Technology and Product management •Test a...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Payment 24: Program management•Reimbursables documentation•Technology and Product management •Test and Measurement services•Meetings documentation. AMEND 11: Adds to tasks of Technology and Project Management; to include updates to the accommodated computer-based test software (TestHear) to include single Text to Speech Voice as part of the software package as specified in Attachment A. AMEND 13: Increase in the amount of $6,486 for the addition of OIPPs as specified in Exhibit 1. Overall deliverable increase from $9,028,492 to $9,034,978. AMEND 14/EXT 1: Overall deliverable decrease from $9,034,978 to $5,268,715. Tasks de-scopes as follows: Program management - decrease of $499,657; Reimbursables documentation - decrease of $76,271; Technology and product management – decrease of $420,436; Test and measurement services - decrease of $ 254,400; Meetings documentation – decrease of $56,250; Winter EOCs, - decrease of $ 292,429; FCAT 2.0 Reading and Mathematics tasks – decrease of $ 1,371,907; FCAT 2.0 Writing tasks – decrease of $ 726,187 and Spring EOCs - decrease of $ 68,726. |
Deliverable Price: $5,268,715.00 |
Non Price Justification: |
Performance Metrics: Fall EOCs, including Technology and product management, Scoring and reporting•Fall Retake, including Technology and product management, Scoring and reporting•Winter EOCs, including Technology and product management, Printed products/CBT tests, Packaging, distribution, and processing, Scoring and reporting•FCAT 2.0 Reading and Mathematics, including Technology and product management, Printed products/CBT tests, Packaging, distribution, and processing•FCAT 2.0 Science, including Technology and product management, Printed tests, Packaging, distribution, and processing•FCAT 2.0 Writing Field Test, including Technology and product management, Packaging, distribution, and processing•FCAT 2.0 Writing, including Technology and product management, Packaging, distribution, and processing•Spring EOCs, including Technology and product management, Printed products/CBT tests |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amend 14/Extension 1, Pages 1-8 |
Deliverable Number: |
|
|
|
Educational advisory services
|
Payment 25: Program management; Reimbursables documentation; Technology and Product management; Test...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Payment 25: Program management; Reimbursables documentation; Technology and Product management; Test and Measurement services; Meetings documentation
AMEND 11: Adds to tasks of Technology and Project Management; to include updates to the accommodated computer-based test software (TestHear) to include single Text to Speech Voice as part of the software package as specified in Attachment A. AMEND 12: Increase in the amount of $87,347 for the addition of a Spring 2015 Mathematics retake. Overall deliverable increase from $12,302,063 to $12,389,410. AMEND 13: Increase in the amount of $6,920 and $12,972 for the addition of OIPPs as specified in Exhibit 1. Increase in the amount of $59,704 and $238,815 for the transition to TestNav8 as specified in Exhibit 2. Overall deliverable increase from $12,389,410 to $12,707,821. AMEND 14/EXT 1: Overall deliverable decrease from $12,707,821 to $6,774,678. Tasks de-scopes as follows: Program management - decrease of $522,369; Reimbursables documentation - decrease of $76,271; Technology and product management – decrease of $439,546; Test and measurement services - decrease of $ 265,963; Meetings documentation – decrease of $14,063; Winter EOCs, - decrease of $ 11,462; FCAT 2.0 Reading and Mathematics tasks – decrease of $ 1,558,978; Addition of Spring 2016 FCAT Science Administration - increase of $127,381; FCAT 2.0 Writing tasks – decrease of $2,903,793; Spring EOCs - decrease of $ 224,332 and Summer EOC - decrease of $43,738. |
Deliverable Price: $6,774,678.00 |
Non Price Justification: |
Performance Metrics: Winter EOCs, including Scoring and reporting •FCAT 2.0 Reading and Mathematics, including Test development, Technology and product management, Printed products/CBT tests, Packaging, distribution, and processing•FCAT 2.0 Science, including Test development, Technology and product management, Packaging, distribution, and processing•FCAT 2.0 Writing, including Technology and product management, Packaging, distribution, and processing, Scoring and reporting•Spring EOCs, including Test development, Technology and product management, Printed products/CBT tests, Packaging, distribution, and processing•Summer EOCs, including Technology and product management, Printed products/CBT tests |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amend 14/Extension 1, Pages 1 - 8 |
Deliverable Number: |
|
|
|
Educational advisory services
|
Payment 26: Program management Reimbursables documentation •Technology and Product management•Test a...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Payment 26: Program management Reimbursables documentation •Technology and Product management•Test and Measurement services. AMEND 11: Adds to tasks of Technology and Project Management; to include updates to the accommodated computer-based test software (TestHear) to include single Text to Speech Voice as part of the software package as specified in Attachment A. AMEND 12: Increase in the amount of $57,048 for the addition of a Spring 2015 Mathematics retake. Overall deliverable increase from $19,015,321 to $19,072,369. AMEND 13: Increase in the amount of $12,972 for the addition of OIPPs as specified in Exhibit 1. Increase in the amount of $74,629 for the transition to TestNav8 as specified in Exhibit 2. Overall deliverable increase from $19,072,369 to $19,159,970. AMEND 14/EXT 1: Overall deliverable decrease from $19,159,970 to $6,810,010. Tasks de-scopes as follows: Program management - decrease of $499,657; Reimbursables documentation - decrease of $76,271; Technology and product management – decrease of $420,436; Test and measurement services - decrease of $254,400; FCAT 2.0 Reading and Mathematics - decrease of $6,770,724; Addition of Spring 2016 FCAT Science Administration - increase of $191,072; FCAT 2.0 Writing scoring and reporting - decrease of $3,622,917; Spring EOCs -decrease of $409,292 and Summer EOCs - decease of $487,336. |
Deliverable Price: $6,810,010.00 |
Non Price Justification: |
Performance Metrics: FCAT 2.0 Reading and Mathematics, including Technology and product management, Printed products/CBT tests, Packaging, distribution, and processing, Scoring and reporting• FCAT 2.0 Science, including Test development, Technology and product management, Scoring and Reporting• FCAT 2.0 Writing, including Scoring and reporting• Spring EOCs, including Test development, Technology and product management, Packaging, distribution, and processing, Scoring and reporting•Summer EOCs, including Test development, Technology and product management, Printed products/CBT tests, Packaging, distribution, and processing, Scoring and reporting |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day |
Source Documentation Page Reference: Amend 14/Extension 1, Pages 1 - 8 |
Deliverable Number: |
|
|
|
Educational advisory services
|
Payment 27: Program management; Reimbursables documentation•Technology and Product management•Test ...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Payment 27: Program management; Reimbursables documentation•Technology and Product management•Test and Measurement services. AMEND 11: Adds to tasks of Technology and Project Management; to include updates to the accommodated computer-based test software (TestHear) to include single Text to Speech Voice as part of the software package as specified in Attachment A. AMEND 14/EXT 1: Overall deliverable increase from $2,300,997 to $5,367,107. Tasks de-scopes as follows: Program management - decrease of $227,117; Reimbursables documentation - decrease of $203,389; Test and measurement services - decrease of $115,636; FCAT 2.0 Reading and Mathematics - decrease of $189,934; Addition of following deliverables from the Extension period: Program management - addition of $337,270; Reimbursables documentation - addition of $237,512; Technology and product management - addition of $508,569 ; Test and measurement services - addition of $201 ,868 ; Meetings documentation - addition of $288.398; Fall EOCs - addition of $566,679; Fall Retake - addition of $1 ,119,533; Winter EOCs - addition of $403,352; FCAT 2.0 Reading and Mathematics retakes - addition of $105,540; and FCAT 2.0 Science - addition of $224,573. |
Deliverable Price: $5,367,107.00 |
Non Price Justification: |
Performance Metrics: FCAT 2.0 Reading and Mathematics, including Scoring and reporting• FCAT 2.0 Science, including Scoring and reporting• Summer EOCs, including Technology and product management, Scoring and reporting• Less the cost of unused funds as specified in RFP Section 7.12 and Section VII of this Contract Amendment No. 10." AMEND 14/EXT 1: Addition of $3,993,293 from the Extension period: Program management; Reimbursables documentation; Technology and product management; Test and measurement services; Meetings documentation; Fall EOCs, including, test development, technology & product management, printed products/CBT tests, packaging, distribution, & processing, scoring & reporting; Fall Retake, including test development, technology & product management, printed products/CBT tests, packaging, distribution, processing, scoring & reporting; Winter EOCs, including test development, technology & product management, printed products/CBT tests; FCAT 2.0 Reading & Mathematics retakes only, including technology & product management, printed products/CBT tests, scoring & reporting; FCAT 2.0 Science, including technology &product management, scoring & reporting. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day |
Source Documentation Page Reference: Amend 14/Extension 1, Pages 1 - 8 |
Deliverable Number: |
|
|
|
Educational advisory services
|
AMEND 14/EXT 1: Extension ADDS Payment 28 for an additional 6 month period for the following deliver...
|
Advanced - Fixed Price Unit Cost
|
Major Deliverable: AMEND 14/EXT 1: Extension ADDS Payment 28 for an additional 6 month period for the following deliverables from the Extension period: Program management, $612,080; Reimbursables documentation, $395,853; Technology & product management, $922,958; Test & measurement services, $366,353; Meetings documentation, $76,906; Fall EOCs, including technology & product management, scoring & reporting, $20,062; Fall Retakes: including technology & product management, scoring & reporting, $185,156; Winter EOCs, including technology & product management, printed
products/CBT tests, packaging, distribution, processing, scoring & reporting, $973,731; FCAT 2.0 Reading & Mathematics - Retakes only, including technology & product management, printed products/CBT tests,packaging, distribution, & processing, $71 ,551; FCAT 2.0 Science, including technology & product management, printed tests, packaging, distribution, & processing, $1,179,802; Spring EOCs, including technology & product management, printed products/CBT tests, packaging, distribution, &processing, $261,336. |
Deliverable Price: $5,065,788.00 |
Non Price Justification: |
Performance Metrics: AMEND 14/EXT 1: This amendment modifies the agreement adding the following additional services and funding for the Extension period of December 1, 2015- May 31, 2016 covering Payment 28 for the following deliverables from the Extension period: Program management; Reimbursables documentation; Technology & product management; Test & measurement services; Meetings documentation; Fall EOCs, including technology & product management, scoring & reporting; Fall Retakes: including technology & product management, scoring & reporting; Winter EOCs, including technology & product management, printed products/CBT tests, packaging, distribution, processing, scoring & reporting; FCAT 2.0 Reading & Mathematics - Retakes only, including technology & product management, printed products/CBT tests,packaging, distribution, & processing; FCAT 2.0 Science, including technology & product management, printed tests, packaging, distribution, & processing; Spring EOCs, including technology & product management, printed products/CBT tests, packaging, distribution, &processing. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day |
Source Documentation Page Reference: Amend 14/Extension 1, Pages 1 - 8 |
Deliverable Number: |
|
|
|
Educational advisory services
|
AMEND 14/EXT 1: Extension ADDS Payment 29 for an additional 6 month period for the following deliver...
|
Fixed Fee / Unit Rate
|
Major Deliverable: AMEND 14/EXT 1: Extension ADDS Payment 29 for an additional 6 month period for the following deliverables from the Extension period: Program management, $612,080; Reimbursables documentation, $395,853; Technology and product management, $922,958; Test and measurement services, $366,353; Meetings documentation, $19,227; Winter EOCs, including scoring and reporting, $36,054; FCAT 2.0 Reading and Mathematics retakes only, test development,
technology and product management, printed products/CBT tests, packaging, distribution, and processing, $173,983; FCAT 2.0 Science, including test development, technology and product management, packaging, distribution, and processing, $1,102,297; Spring EOCs, including test development, technology and product management, printed products/CBT tests, packaging, distribution, and processing, $1,865 ,527; Summer EOCs, including, technology and product management, printed products/CBT tests, $125,028. |
Deliverable Price: $5,619,360.00 |
Non Price Justification: |
Performance Metrics: AMEND 14/EXT 1: This amendment modifies the agreement adding the following additional services and funding for the Extension period of December 1, 2015- May 31, 2016 covering Payment 29 for the following deliverables from the Extension period: Program management; Reimbursables documentation; Technology and product management; Test and measurement services; Meetings documentation; Winter EOCs, including scoring and reporting; FCAT 2.0 Reading and Mathematics retakes only, test development,
technology and product management, printed products/CBT tests, packaging, distribution, and processing; FCAT 2.0 Science, including test development, technology and product management, packaging, distribution, and processing; Spring EOCs, including test development, technology and product management, printed products/CBT tests, packaging, distribution, and processing; Summer EOCs, including, technology and product management, and printed products/CBT tests. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amend 14/Extension 1, Pages 1 - 8 |
Deliverable Number: |
|
|
|
Educational advisory services
|
Amend 15: Attachment C. Section XVII. of the original Contract is hereby deleted and replaced as fol...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Amend 15: Attachment C. Section XVII. of the original Contract is hereby deleted and replaced as follows:
The Contractor agrees to provide the Department within ten days of execution of this Contract Amendment 15 with a performance and payment bond or other security deposited with the Department in the amount of ten percent (10%) of the Amendment 14 total cost, guaranteeing that the Contractor will perform all work according to the Amendment 14, within the tlme and price specified in the
Amendment. |
Deliverable Price: $0.00 |
Non Price Justification: Agreement without a financial exchange or impact |
Performance Metrics: Payments made as per the contract payment schedule upon
completion/delivery of required products/services. No change to contract amount. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amendment 15 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
May 31, 2011: Provide program /project management, weekly management reports, an annual operationa...
|
Fixed Fee / Unit Rate
|
Major Deliverable: May 31, 2011: Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue to update item bank with item bank change forms & data from previous administrations as it becomes available. Continue Cycle 2013 item/prompt development for FCAT/FSA Reading, Math, Science, Writing multiple choice items & End of Course exams. Pilot testing of Writing prompts for FCAT/FSA Writing. Continue planning for Fall 2011 Reading passage bias & sensitivity reviews and Writing prompt reviews for state review meetings. SEE AMENDMENT # 2 |
Deliverable Price: $13,093,721.00 |
Non Price Justification: |
Performance Metrics: Contractor to provide the following: Pack, distribute & retrieve printed test materials. Missing materials report/inventory & disposition of materials. Field test & calibration sample specifications for Writing, Reading , Math, Science, End of Course & early return samples. Calibrating, equating & scaling specifications for Writing, Reading , Math, & Science. Process & score calibration samples. Finalize scanning/scoring specifications for scanning student responses. Create mini state files of scanned student responses for retake & spring tests. Conduct special processing for Braille/large print student responses. Finalize handscoring specifications and score student responses. Create mock/mini state files of scanned student responses for retake, spring tests & End of Course exams. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 9, 10, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Aug 31, 2011: Provide program /project management, weekly management reports, an annual operational...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Aug 31, 2011: Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue to update item bank with item bank change forms & data from previous administrations as it becomes available. Complete Cycle 2013 item/prompt development for FCAT/FSA Reading, Math, Science, Writing multiple choice items & End of Course exams. Pilot testing of Writing prompts for FCAT/FSA Writing. Prepare for review of pilot testing of Writing prompts for FCAT/FSA prompts. |
Deliverable Price: $17,023,706.00 |
Non Price Justification: |
Performance Metrics: Contractor to provide the following: Revise test construction specifications & system based on input from Cycle 2012 test construction. Complete test form construction for Cycle 2012 FCAT/FSA Reading , Math, Science, Writing prompts, Reading/Math retake forms & continue Complete test form construction for Cycle 2012 End of Course exams. Complete Reading/Math retake forms for Fall 2011 computer-based tests. Develop Braille & screen reader accommodations for FCAT/FSA computer-based tests. Pack, distribute & retrieve printed test materials. Provide test administration ancillary materials statewide. Provide field test & calibration sample specifications. Finalize scanning/scoring specifications for scanning student responses. Complete special processing for Braille/large print student responses. Deliver results for FCAT/FSA End of Course exams. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 11, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Nov 30, 2011: Provide program /project management, weekly management reports, an annual operational ...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Nov 30, 2011: Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue to update item bank with item bank change forms & data from previous administrations as it becomes available. Complete post committee review of Cycle 2013 item/prompt development for FCAT/FSA Reading, Math, Science, Writing multiple choice items & End of Course exams. Prepare for Spring 2012 Pilot testing of Writing prompts for FCAT/FSA. SEE AMENDMENT # 's 1, 2, & 3. |
Deliverable Price: $9,205,081.00 |
Non Price Justification: |
Performance Metrics: Contractor to provide the following: Pack, distribute & retrieve printed test materials. Provide missing materials report/inventory & disposition of materials. Provide test administration ancillary materials statewide. Plan & conduct Annual Assessment Coordinators meeting. Provide calibrating, equating & scaling specifications for Writing, Reading , Math & Science. Finalize scanning/scoring specifications for scanning student responses. Create mock/mini state files of scanned student responses for retake tests & End of Course exams. Conduct special processing for Braille/large print student responses & other special handling. Complete results deliveries for FCAT/FSA retake tests, including eltronic results. Conduct technical oversight & prepare special studies. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 11, 12, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Feb 29, 2012: Provide program /project management, weekly management reports, an annual operational ...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Feb 29, 2012: Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue to update item bank with item bank change forms & data from previous administrations as it becomes available. Finalize Cycle 2014 item development. Begin Cycle 2014 item/prompt development for FCAT/FSA Reading, Math, Science, Writing multiple choice items & End of Course exams. Prepare Fall 2012 educator meeting specifications & for Fall 2012 Reading passage, bias & sensitivity reviews, Science expert reviews & Writing prompt reviews for state review meetings. SEE AMENDMENT # 's 1, 2, 3, & 4. |
Deliverable Price: $21,723,460.00 |
Non Price Justification: |
Performance Metrics: Contractor to provide the following: Develop Braille & screen reader accommodations for FCAT/FSA computer-based tests. Finalize pre-identification specifications. Pack, distribute & retreive printed test materials. Provide missing materials report/inventory and disposition of materials. Provide test administration ancillary materials statewide, including FCAT/FSA test administration manuals & rulers. Process & score calibration samples for Writing test. Create mock/mini state files of scanned student responses for retake tests & spring tests. Score student responses, including Finalize handscoring specifications. Conduct technical oversight & prepare special studies & calibration/equating studies. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 12, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
May 31, 2012: Provide program /project management, weekly management reports, an annual operational ...
|
Fixed Fee / Unit Rate
|
Major Deliverable: May 31, 2012: Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue to update item bank with item bank change forms & data from previous administrations as it becomes available. Continue Cycle 2014 item/prompt development for FCAT/FSA Reading, Math, Science, Writing multiple choice items & End of Course exams. Pilot testing of Writing prompts for FCAT/FSA Writing. Continue planning for Fall 2012 Reading passage, bias & sensitivity reviews, & Writing prompt reviews for state review meetings. SEE AMENDMENT # 's 1, 2, 4, & 5. |
Deliverable Price: $12,147,753.00 |
Non Price Justification: |
Performance Metrics: Contractor to provide the following: Pack, distribute & retreive printed test materials. Provide missing materials report/inventory and disposition of materials. Provide test administration ancillary materials statewide, including FCAT/FSA test administration manuals & other ancillary materials. Provide field test & calibration sample specifications for Writing, Reading , Math, & Science, End of Course & early return samples. Finalize scanning/scoring specifications for scanning student responses. Create mock/mini state files of scanned student responses for retake tests & spring tests. Score student responses, including Finalize handscoring specifications. Conduct special processing for Braille/large print student responses & other special handling. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 12, 13, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Jun 30, 2009; Provide program /project management, weekly management reports, an annual operational ...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Jun 30, 2009; Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Begin migration of items from existing item bank to new item bank /update item bank. Complete item development plan for comprehensive test item development for Cycle 2011. Begin item/prompt development for Cycle 2011 FCAT/FSA and plan for Cycle 2011 development for End of Course Exams. |
Deliverable Price: $4,590,738.00 |
Non Price Justification: |
Performance Metrics: Contractor to complete the following: production specifications & style guide for 2010 printed tests; pre-identification specifications for materials distribution; field tests & calibration sample specifications for Reading, Math, Science & early return sample. Finalize plans for handscoring replication study. Develop reports & file specifications for score reporting. Begin planning results deliveries for FCAT/retake test and prepare production specifications, sample test materials & test item specifications for Interpretive Products. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 4, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Aug 31, 2009; Provide program /project management, weekly management reports, an annual operational ...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Aug 31, 2009; Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue migration of items from existing item bank to new item bank /update item bank. Complete item/prompt development for Cycle 2011 FCAT/FSA and plan for Cycle 2011 development for End of Course Exams. Prepare material to conduct Reading passage reviews, bias & sensitivity reviews & finalize educator meeting specifications for 2009 state review meetings. Continue review of field test forms & item sets development for 2010 FCAT/FSA Reading, Math, Science & End of Course exams. Revise test construction specifications & system based on input from 2010 test construction. |
Deliverable Price: $9,109,260.00 |
Non Price Justification: |
Performance Metrics: Contractor to complete the following: test form construction from 2010 FCAT/FSA Reading, Math, Science, Writing prompts, Reading/Math retake forms & End of Course exams. Prepare printing test books, answer documents & retake forms for 2010 FCAT/FSA printed tests. Complete Cycle 2010 production specifications, style guide & Reading/Math retake forms for computer based tests. Begin construction of Braille, large print & 1 item per page accommodations for 2010 FCAT/FSA paper based tests. Provide test administration ancillary materials statewide; prepare Field test & calibration sample specifications for Reading, Math, Science & early return samples. Prepare Calibrating, equating & scaling specifications for Reading, Math & Science. Develop FCAT/FSA scoring tables for fall, spring retakes; Writing administration & spring Reading, Math & Science administrations. Develop data verification specifications & quality control systems & verify answer key for data verification & quality assurance. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 4, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Nov 30, 2009; Provide program /project management, weekly management reports, an annual operational ...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Nov 30, 2009; Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue migration of items from existing item bank to new item bank /update item bank. |
Deliverable Price: $7,976,126.00 |
Non Price Justification: |
Performance Metrics: Contractor to complete the following: complete item/prompt development for Cycle 2011 FCAT/FSA Reading, Math, Science & continue Cycle 2011 item/prompt development for End of Course exams; conduct Reading passage reviews, bias & sensitivity reviews & complete educator meeting specifications for 2009 state review meetings. Complete Test form construction for End of Course exams; complete Braille, large print & 1 item per page accommodations for 2010 FCAT/FSA paper based tests. Pack, distribute & retrieve printed test materials. Provide customer satisfaction information, missing materials report/inventory & disposition of materials. Complete results deliveries for FCAT/FSA retake tests, including electronic results and conduct item content reviews for Cycle 2011 Reading and Math development. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 5, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Aug 31, 2012: Provide program /project management, weekly management reports, an annual operational...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Aug 31, 2012: Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue to update item bank with item bank change forms & data from previous administrations as it becomes available. Complete Cycle 2014 item/prompt development for FCAT/FSA Reading, Math, Science, Writing multiple choice items & End of Course exams. Finalize planning for Fall 2012 bias & sensitivity reviews for state review meetings. SEE AMENDMENT # 's 1, 2, & 4. |
Deliverable Price: $16,639,283.00 |
Non Price Justification: |
Performance Metrics: Contractor to provide the following: Complete Read/Math re-take forms for Fall 2012 computer-based tests. Develop Braille & screen reader accommodations for FCAT/FSA computer-based tests. Pack, distribute printed test materials. Provide customer satisfaction information, missing materials report/inventory and disposition of materials. Provide test administration ancillary materials statewide, including FCAT/FSA test administration manuals & other ancillary materials. Test Administration debrief for the Administration Annual Meeting. Provide field test & calibration sample specifications for Writing, Reading, Math, & Science, & End of Course. Complete Processing & scoring of calibration samples. Finalize scanning/scoring specifications for scanning student responses. Create mini state files of scanned student responses for retake tests, spring tests & End of Course exams. Deliver complete results for FCAT/FSA exams for reporting of scores. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 14, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Nov 30,2012: Provide program /project management, weekly management reports, an annual operational p...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Nov 30,2012: Provide program /project management, weekly management reports, an annual operational plan, a quarterly project schedule, and a quarterly accounting report. Continue to update item bank with item bank change forms & data from previous administrations as it becomes available. Conduct post-committee review of Cycle 2013 item/prompt development for FCAT/FSA Reading, Math, Science, Writing multiple choice items & End of Course exams. Prepare for Spring 2013 Pilot testing of Writing prompts for FCAT/FSA. SEE AMENDMENT # 's 1, 2, 3, 5 & 6. |
Deliverable Price: $8,410,766.00 |
Non Price Justification: |
Performance Metrics: Contractor to provide the following: Complete Fall 2012 bias & sensitivity reviews for state review meetings, Complete prinitng test books and answer documents for Cycle 2013 End of Course exams with accommodations. Finalize Cycle 2013 End of Course exams for computer-based tests. Pack, distribute & retrieve printed test materials. Provide missing materials report/inventory & dispostion of materials. Provide test administration ancillary materials statewide, including End of Course test administration manuals & other ancillary materials. Plan & conduct Annual Assessment Coordinators meeting. Provide calibrating, equating & scaling specifications for Writing, Reading , Math & Science. Provide test administration ancillary materials statewide. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Attachment A, Pages 14, 15, 22 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Amend # 3 - (11) Nov 30, 2011: payment increased from $9,404,093 to $9,695,850 due to removal or cha...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Amend # 3 - (11) Nov 30, 2011: payment increased from $9,404,093 to $9,695,850 due to removal or change of items from item bank and operational plan. |
Deliverable Price: $291,757.00 |
Non Price Justification: |
Performance Metrics: Amend # 3 changes the following: Addition of work tasks related to an alignment study for Reading and Math FCAT 2.0 and Algebra 1 EOC. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amendment # 3, Pages 3, 4 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Amend # 3 - (12) Feb 29, 2012: payment increased from $21,662,308 to $21,735,859 due to removal or c...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Amend # 3 - (12) Feb 29, 2012: payment increased from $21,662,308 to $21,735,859 due to removal or change of items from item bank and operational plan. |
Deliverable Price: $73,551.00 |
Non Price Justification: |
Performance Metrics: Amend # 3 changes the following: Addition of the writing prompt to the writing folder. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amendment # 3, Pages 4, 5 |
Deliverable Number: |
|
|
|
EDUCATION & TRAINING CONSULTANT
|
Amend # 3 - (15) Nov 30, 2012: payment increased from $8,831,967 to $8,963,430 due to removal or cha...
|
Fixed Fee / Unit Rate
|
Major Deliverable: Amend # 3 - (15) Nov 30, 2012: payment increased from $8,831,967 to $8,963,430 due to removal or change of items from item bank and operational plan. |
Deliverable Price: $131,463.00 |
Non Price Justification: |
Performance Metrics: Amend # 3 changes the following: Addition of work tasks related to an alignment study for SCIENCE fcat 2.0 AND Biology 1 EOC. |
Financial Consequences: The Contractor's failure to complete work tasks correctly & on time will result in damages to the Department. These damages are considered as a default and shall be deemed corrected on the date the work task has been correctly completed. Liquidated damages will be deemed as Critical Work Tasks or Extremely Critical Work Tasks. For each default on a Critical Work Task for each & every day work remains uncompleted beyond the time set the Contractor shall be liable for $5000 per calendar day. For each default on an Extremely Critical Work Task the Contractor shall be liable for liquidated damages for each number of business days elapsed after the default as follows: 1st $10,000, 2nd $30,000, 3rd $60,000, 4th $90,000, 5th $120,000, 6th $150,000, 7th & subsequent days $250,000 per day. |
Source Documentation Page Reference: Amendment # 3, Page 8 |
Deliverable Number: |
|