Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
February 2017; Test Administration: Spring ELA/L and Mathematics: Deliver preidentification labels a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: February 2017; Test Administration: Spring ELA/L and Mathematics: Deliver preidentification labels and rosters. For each administration, all preidentification labels and rosters must be successfully delivered to districts by the critical or extremely critical date listed in Appendix B. ITN References 7.5.2, 7.4.7.3, and 7.4.7.4 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide proof of delivery spreadsheet listing the following for each shipment: date/time delivered, who received materials, destination address, quantity and type of material delivered. Must show proof of successful delivery to all participating districts. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
August 2016; Test Administration: Fall EOC: Deliver preidentification labels and rosters. For each a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: August 2016; Test Administration: Fall EOC: Deliver preidentification labels and rosters. For each administration, all preidentification labels and rosters must be successfully delivered to districts by the critical or extremely critical date listed in Appendix B. ITN References 7.5.2, 7.4.7.3, and 7.4.7.4 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide proof of delivery spreadsheet listing the following for each shipment: date/time delivered, who received materials, destination address, quantity and type of material delivered. Must show proof of successful delivery to all participating districts. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2016; Test Administration: Winter EOC: Deliver preidentification labels and rosters. For ea...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2016; Test Administration: Winter EOC: Deliver preidentification labels and rosters. For each administration, all preidentification labels and rosters must be successfully delivered to districts by the critical or extremely critical date listed in Appendix B. ITN References 7.5.2, 7.4.7.3, and 7.4.7.4 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide proof of delivery spreadsheet listing the following for each shipment: date/time delivered, who received materials, destination address, quantity and type of material delivered. Must show proof of successful delivery to all participating districts. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
April 2016; Test Administration: Spring EOC: Deliver preidentification labels and rosters. For each ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: April 2016; Test Administration: Spring EOC: Deliver preidentification labels and rosters. For each administration, all preidentification labels and rosters must be successfully delivered to districts by the critical or extremely critical date listed in Appendix B. ITN References 7.5.2, 7.4.7.3, and 7.4.7.4 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide proof of delivery spreadsheet listing the following for each shipment: date/time delivered, who received materials, destination address, quantity and type of material delivered. Must show proof of successful delivery to all participating districts. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
April 2017; Test Administration: Spring EOC: Deliver preidentification labels and rosters. For each ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: April 2017; Test Administration: Spring EOC: Deliver preidentification labels and rosters. For each administration, all preidentification labels and rosters must be successfully delivered to districts by the critical or extremely critical date listed in Appendix B. ITN References 7.5.2, 7.4.7.3, and 7.4.7.4 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide proof of delivery spreadsheet listing the following for each shipment: date/time delivered, who received materials, destination address, quantity and type of material delivered. Must show proof of successful delivery to all participating districts. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
July 2016; Test Administration: Summer EOC: Deliver preidentification labels and rosters. For each a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: July 2016; Test Administration: Summer EOC: Deliver preidentification labels and rosters. For each administration, all preidentification labels and rosters must be successfully delivered to districts by the critical or extremely critical date listed in Appendix B. ITN References 7.5.2, 7.4.7.3, and 7.4.7.4 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide proof of delivery spreadsheet listing the following for each shipment: date/time delivered, who received materials, destination address, quantity and type of material delivered. Must show proof of successful delivery to all participating districts. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2015; Test Administration: Fall ELA/L Retake: Deliver and maintain the online management sy...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2015; Test Administration: Fall ELA/L Retake: Deliver and maintain the online management system for the life of the contract. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2016; Test Administration: Fall ELA/L Retake: Deliver and maintain the online management sy...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2016; Test Administration: Fall ELA/L Retake: Deliver and maintain the online management system for the life of the contract. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
May 2016; Test Administration: Spring ELA/L Retake: Deliver and maintain the online management syste...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: May 2016; Test Administration: Spring ELA/L Retake: Deliver and maintain the online management system for each assessment. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
May 2017; Test Administration: Spring ELA/L Retake: Deliver and maintain the online management syste...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: May 2017; Test Administration: Spring ELA/L Retake: Deliver and maintain the online management system for each assessment. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2016; Test Administration: Spring ELA/L and Mathematics: Deliver and maintain the online manage...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2016; Test Administration: Spring ELA/L and Mathematics: Deliver and maintain the online management system for each assessment. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $438,152.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2015; Test Administration: Fall EOC: Deliver and maintain the online management system for ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2015; Test Administration: Fall EOC: Deliver and maintain the online management system for each assessment. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2016; Test Administration: Fall EOC: Deliver and maintain the online management system for ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2016; Test Administration: Fall EOC: Deliver and maintain the online management system for each assessment. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
February 2017; Test Administration: Winter EOC: Deliver and maintain the online management system fo...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: February 2017; Test Administration: Winter EOC: Deliver and maintain the online management system for each assessment. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
July 2016; Test Administration: Spring EOC: Deliver and maintain the online management system for ea...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: July 2016; Test Administration: Spring EOC: Deliver and maintain the online management system for each assessment. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $14,659.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
August 2016; Test Administration: Summer EOC: Deliver and maintain the online management system for ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: August 2016; Test Administration: Summer EOC: Deliver and maintain the online management system for each assessment. Provide evidence that the online management system met the requirements of the contract and was operable for the invoice period. ITN Reference 7.4.8 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2016; Test Administration: Fall ELA/L Retake: Deliver a computer-based assessment platform ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2016; Test Administration: Fall ELA/L Retake: Deliver a computer-based assessment platform that meets the specifications in the contract for each computer-based administration. Provide evidence that the computer-based assessment platform met the requirements of the contract and was operable for the invoice period. This includes the availability of the system check and an infrastructure test. ITN Reference 7.4.9 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
May 2016; Test Administration: Spring ELA/L Retake: Deliver a computer-based assessment platform tha...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: May 2016; Test Administration: Spring ELA/L Retake: Deliver a computer-based assessment platform that meets the specifications in the contract for each computer-based administration. Provide evidence that the computer-based assessment platform met the requirements of the contract and was operable for the invoice period. This includes the availability of the system check and an infrastructure test. ITN Reference 7.4.9 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
May 2017; Test Administration: Spring ELA/L Retake: Deliver a computer-based assessment platform tha...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: May 2017; Test Administration: Spring ELA/L Retake: Deliver a computer-based assessment platform that meets the specifications in the contract for each computer-based administration. Provide evidence that the computer-based assessment platform met the requirements of the contract and was operable for the invoice period. This includes the availability of the system check and an infrastructure test. ITN Reference 7.4.9 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2016; Test Administration: Spring ELA/L and Mathematics: Deliver a computer-based assessment pl...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2016; Test Administration: Spring ELA/L and Mathematics: Deliver a computer-based assessment platform that meets the specifications in the contract for each computer-based administration. Provide evidence that the computer-based assessment platform met the requirements of the contract and was operable for the invoice period. This includes the availability of the system check and an infrastructure test. ITN Reference 7.4.9 |
| Deliverable Price: $9,759,121.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2016; Test Administration: Fall EOC: Deliver a computer-based assessment platform that meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2016; Test Administration: Fall EOC: Deliver a computer-based assessment platform that meets the specifications in the contract for each computer-based administration. Provide evidence that the computer-based assessment platform met the requirements of the contract and was operable for the invoice period. This includes the availability of the system check and an infrastructure test. ITN Reference 7.4.9 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
February 2017; Test Administration: Winter EOC: Deliver a computer-based assessment platform that me...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: February 2017; Test Administration: Winter EOC: Deliver a computer-based assessment platform that meets the specifications in the contract for each computer-based administration. Provide evidence that the computer-based assessment platform met the requirements of the contract and was operable for the invoice period. This includes the availability of the system check and an infrastructure test. ITN Reference 7.4.9 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
July 2016; Test Administration: Spring EOC: Deliver a computer-based assessment platform that meets ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: July 2016; Test Administration: Spring EOC: Deliver a computer-based assessment platform that meets the specifications in the contract for each computer-based administration. Provide evidence that the computer-based assessment platform met the requirements of the contract and was operable for the invoice period. This includes the availability of the system check and an infrastructure test. ITN Reference 7.4.9 |
| Deliverable Price: $185,702.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
August 2016; Test Administration: Summer EOC: Deliver a computer-based assessment platform that meet...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: August 2016; Test Administration: Summer EOC: Deliver a computer-based assessment platform that meets the specifications in the contract for each computer-based administration. Provide evidence that the computer-based assessment platform met the requirements of the contract and was operable for the invoice period. This includes the availability of the system check and an infrastructure test. ITN Reference 7.4.9 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) malfunctions or unavailability of the site that occurred during the period, signed by the Department team. Delivered at the initiation of the contract; report will cover from 15 days before the previous invoice period through 15 days prior to the current invoice billing date. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
September 2016; Test Administration: PERIODIC: Develop and deliver approved practice tests and tutor...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: September 2016; Test Administration: PERIODIC: Develop and deliver approved practice tests and tutorials for the computer-based and paper-based assessments (sample test materials and computer-based practice tests). According to production schedules, all practice materials must be developed and approved on a timeline to be established that offers students enough time to practice prior to each administration. All practice tests (computer-based and paper-based) must contain 10-20 sample items. For the paper-based practice materials, there will be a separate test booklet and a separate answer key booklet for teachers. These paper-based practice materials are produced in ADA-compliant PDF files for posting. Practice materials must also be produced for all accommodated versions (computer-based accommodations and paper-based accommodations, such as braille and large print). ITN Reference 7.3.7.5 and 7.4.9.6 |
| Deliverable Price: $8,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the practice tests and tutorials that reflect the requirements for each year of the assessment. For year 1 of the contract, this will be PDFs for all grades and subjects, and computer-based practice tests for all grades and subjects that will be offered as computer-based subjects the first year. As grades and subjects are added each year (per the schedule in Appendix A), the appropriate computer-based practice tests must also be released. This delivery includes the annual delivery of requested paper-based accommodated versions, which are the only versions that are shipped to districts. (All others are published or linked for distribution.) |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|