Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2014; Writing Field Test, Program Management: Periodic: Program Management Meetings. The co...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2014; Writing Field Test, Program Management: Periodic: Program Management Meetings. The contractor will coordinate regular management meetings between the contractor and Department staff. The number and type of meetings are provided in 7.7.5 of the ITN. |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Include support for all meetings since the previous invoice. (2) Provide the meeting costs, a final agenda, and a final list of attendees for each meeting.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
August 2014; Test Development: Periodic: Production Specifications Document. This secure document in...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: August 2014; Test Development: Periodic: Production Specifications Document. This secure document includes the specific processes, procedures, and design guidelines for all print, computer-based, and accommodated tests, ancillaries, and interpretive products. ITN Reference 7.3.10 |
| Deliverable Price: $47,796.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final production specifications document. (2) The final production specifications file provided via SFTP. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2016; Test Development: Periodic: Production Specifications Document. This secure document incl...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2016; Test Development: Periodic: Production Specifications Document. This secure document includes the specific processes, procedures, and design guidelines for all print, computer-based, and accommodated tests, ancillaries, and interpretive products. ITN Reference 7.3.10 |
| Deliverable Price: $2,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final production specifications document. (2) The final production specifications file provided via SFTP. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
July 2016; Test Development: Spring ELA/L Retake: Periodic: Handscoring Specifications. The contract...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: July 2016; Test Development: Spring ELA/L Retake: Periodic: Handscoring Specifications. The contractor will incorporate the handscoring requirements into written handscoring specifications prior to scoring. The handscoring specifications will be a detailed guide to conducting handscoring that will be used by the contractor’s handscoring managers and the Department. The applicable administrations/assessments will be determined in the final negotiations. ITN Reference 7.5.4.5 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring specifications. (2) The final handscoring specifications provided via SFTP.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2014; Writing Field Test, Program Management: Periodic: Production Schedule.The production sche...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2014; Writing Field Test, Program Management: Periodic: Production Schedule.The production schedule shows the Department’s beginning and ending review dates by test document for each review round. ITN Reference 7.7.2 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Appearance of schedule in weekly management report
(2) Provide Department email reflecting approval of proposed or revised production schedule.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
October 2014; Writing Field Test, Scaling, Equating, Scoring, and Special Psychometric Studies. Peri...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: October 2014; Writing Field Test, Scaling, Equating, Scoring, and Special Psychometric Studies. Periodic: Drawing Samples for Operational and/or Field Test Administrations. Delivering the data files including sampled units from the populations and the respective reports. Sampling report must describe the initial analyses on the SSR files, procedures for how to collect data, evaluate the representativeness of resulting sample and a list of post-hoc analyses for representativeness checks when data from test administrations are in for operational processing. ITN Reference 7.6.0, 7.6.1, and 7.6.2.2 |
| Deliverable Price: $20,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Data files, including sampled units from the populations, posted to SFTP. (2) Provide Department email reflecting receipt and approval of the samples. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2014; Writing Field Test, Scaling, Equating, Scoring, and Special Psychometric Studies: Periodi...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2014; Writing Field Test, Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Development of the Sampling Plans. Detailed plan for sampling of students from the State. Sampling plan must describe the initial analyses on the SSR files, introducing plans for how to collect data, and the list of post-hoc analyses for representativeness checks when data from test administrations are in for operational processing. ITN Reference 7.6.2.2 |
| Deliverable Price: $30,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Final versions of sampling plans posted to SFTP.
(2) Provide Department email reflecting receipt and approval of the sampling plans. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2014; Writing Field Test, Scaling, Equating, Scoring, and Special Psychometric Studies: Per...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2014; Writing Field Test, Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Development of Test Forms for Field Test and/or Operational Administrations. All paper-based and computer-based forms for the tests, as agreed upon by the Department and memorialized in the approved Test Construction Specifications, must be submitted and approved. ITN Reference 7.6.0 and 7.6.1 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Test forms are secure, and therefore the contractor shall post them to SFTP. The Department shall maintain a copy of the materials on file as needed for evidence of completion of the deliverable. (2) Provide Department email reflecting receipt and approval of the final paper-based and computer-based forms. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
September 2014; Writing Field Test, Scoring and Reporting: Writing FT: Development of the file layou...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: September 2014; Writing Field Test, Scoring and Reporting: Writing FT: Development of the file layout and Full-State PreID data file in .txt format. The Contractor will work with the Department to create a PreID layout for each administration for the district to use to upload student demographic and testing information. The contractor will post the layout to online management system. After each PreID window closes, the contractor will create and send to the Department a full state PreID file that includes a record for each student and test assigned. ITN Reference 7.5.2 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Final PreID file layout posted to the online management system and Secure File Transfer Protocol (SFTP). (2) PreID data file posted to the SFTP. (3) Provide Department email reflecting the receipt and approval of the file layout and data file. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2014; Writing Field Test, Scoring and Reporting: Writing FT: Development of PreID freq repo...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2014; Writing Field Test, Scoring and Reporting: Writing FT: Development of PreID freq reports for Department and districts to review. The Contractor will collect and monitor district PreID data submission and will submit PreID Frequency Reports and the reports of issues encountered during the PreID upload for all assessments. ITN Reference 7.5.2 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) PreID frequency reports posted to the online management system. (2) Provide Department email reflecting receipt of the PreID frequency reports.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2014; Writing Field Test, Test Administration: Writing FT: Deliver Computer-Based Test form...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2014; Writing Field Test, Test Administration: Writing FT: Deliver Computer-Based Test forms (including accommodated versions). Test forms are developed and available for use on the first day of each CBT administration ITN Reference 7.3.11.2 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final product and its availability.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
January 2015; Writing Field Test, Test Administration: Writing FT: Produce reports and recommendatio...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: January 2015; Writing Field Test, Test Administration: Writing FT: Produce reports and recommendations from all online comment forms. Includes data file of all responses, analysis, and recommended actions, with summary of selected response questions from all online comment forms. ITN Reference 7.4.1 and 7.4.7.7 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the comment form summaries and analyses.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2014; Writing Field Test, Test Administration: PERIODIC: Provide customer service throughou...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2014; Writing Field Test, Test Administration: PERIODIC: Provide customer service throughout the year, with additional customer service provided at peak times leading up to and following each test administration. The contractor will provide customer service and provide call/email logs from each week to the Department for review. ITN Reference 7.4.10 |
| Deliverable Price: $60,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide a report listing met requirements and any (or no) errors or unavailability of the customer service system that occurred during the period, signed by the Department team. Invoice at the end of each assessment year (end of Summer EOC administration) for the assessments from the previous year. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June, 2014; Writing Field Test, Test Development: Periodic: Interpretive Products: Test Item Specifi...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June, 2014; Writing Field Test, Test Development: Periodic: Interpretive Products: Test Item Specifications Documents. Test item specifications will be produced for all grades/subjects and may be grouped together in one booklet by grade band or content area. They are based on the standards and define both the content and the format of the test items. Their primary purpose is to establish guidelines for test item writers and reviewers. ITN Reference 7.3.7.5 |
| Deliverable Price: $100,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of each test item specification document. (2) Final PDF files provided via SFTP.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2014; Writing Field Test, Test Development: Writing FT: Handscoring Specifications. The con...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2014; Writing Field Test, Test Development: Writing FT: Handscoring Specifications. The contractor will incorporate the handscoring requirements into written handscoring specifications prior to scoring. The handscoring specifications will be a detailed guide to conducting handscoring that will be used by the contractor’s handscoring managers and the Department. The applicable administrations/assessments will be determined in the final negotiations. ITN Reference 7.5.4.5 |
| Deliverable Price: $40,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring specifications. (2) The final handscoring specifications provided via SFTP. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
2016; Program Management: Periodic: Program Management Reports: Collect Accounting Reports. A summar...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: 2016; Program Management: Periodic: Program Management Reports: Collect Accounting Reports. A summary of the Quarterly Accounting Reports, including expenditures by program task and level of effort as well as expenditures and balances of Reimbursable Funding Categories identified in Section 7.7.9, including balances resulting from executed change orders and contract amendments. ITN Ref 7.7.6 |
| Deliverable Price: $99,710.00 |
| Non Price Justification: |
| Performance Metrics: (1) For each invoice period, provide the quarterly accounting reports. NOTE: Invoices will be received by the 30th of the month subsequent to the prior quarter as specified in ATTACHMENT B, SECTION III. The amounts indicated for each fiscal year will be paid at one (1) quarter) of the amount specified in the deliverable price for the year. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
2014; Program Management: Periodic: Program Management Reports: Collect Accounting Reports. A summar...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: 2014; Program Management: Periodic: Program Management Reports: Collect Accounting Reports. A summary of the Quarterly Accounting Reports, including expenditures by program task and level of effort as well as expenditures and balances of Reimbursable Funding Categories identified in Section 7.7.9, including balances resulting from executed change orders and contract amendments. ITN Ref 7.7.6 |
| Deliverable Price: $99,882.00 |
| Non Price Justification: |
| Performance Metrics: (1) For each invoice period, provide the quarterly accounting reports. NOTE: Invoices will be received by the 30th of the month subsequent to the prior quarter as specified in ATTACHMENT B, SECTION III. The amounts indicated for each fiscal year will be paid at one (1) quarter) of the amount specified in the deliverable price for the year. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2016; Program Management: Periodic: Annual Program Review. Review will include a record of ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2016; Program Management: Periodic: Annual Program Review. Review will include a record of the contractor’s services and deliverables in response to contractual/ITN requirements. This review must identify major program accomplishments and successes, as well as areas of the program that require changes and improvement in the upcoming year. The review is intended to be a history of program events and to describe recommended improvements or changes for subsequent years. The annual review will be based on information gathered by the contractor’s program and project management staff throughout the year. The review will address all aspects of program service and products including management, technology, interpretive products, communications, development, test production, test administration, materials shipping/pickup, scoring, and reporting processes. It will also follow the annual administrative cycle, beginning with fall and ending with the following summer. ITN Reference 7.7.6 |
| Deliverable Price: $78,060.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide evidence of Department acceptance and approval of the annual program review for the previous administration year.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2015; Program Management: Periodic: Annual Program Review. Review will include a record of ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2015; Program Management: Periodic: Annual Program Review. Review will include a record of the contractor’s services and deliverables in response to contractual/ITN requirements. This review must identify major program accomplishments and successes, as well as areas of the program that require changes and improvement in the upcoming year. The review is intended to be a history of program events and to describe recommended improvements or changes for subsequent years. The annual review will be based on information gathered by the contractor’s program and project management staff throughout the year. The review will address all aspects of program service and products including management, technology, interpretive products, communications, development, test production, test administration, materials shipping/pickup, scoring, and reporting processes. It will also follow the annual administrative cycle, beginning with fall and ending with the following summer. ITN Reference 7.7.6 |
| Deliverable Price: $78,060.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide evidence of Department acceptance and approval of the annual program review for the previous administration year.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
April 2016; Program Management: Periodic: Production Schedule. The production schedule shows the Dep...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: April 2016; Program Management: Periodic: Production Schedule. The production schedule shows the Department’s beginning and ending review dates by test document for each review round. ITN Reference 7.7.2 |
| Deliverable Price: $39,900.00 |
| Non Price Justification: |
| Performance Metrics: (1) Appearance of schedule in weekly management report
(2) Provide Department email reflecting approval of proposed or revised production schedule.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2014; Program Management: Periodic: Production Schedule. The production schedule shows the Depa...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2014; Program Management: Periodic: Production Schedule. The production schedule shows the Department’s beginning and ending review dates by test document for each review round. ITN Reference 7.7.2 |
| Deliverable Price: $94,569.00 |
| Non Price Justification: |
| Performance Metrics: (1) Appearance of schedule in weekly management report
(2) Provide Department email reflecting approval of proposed or revised production schedule.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
August 2016; Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Linking Florida...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: August 2016; Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Linking Florida Standards Assessments to International Assessments. Conducting all of the planned analyses, preparing a final technical report, and sharing the results of linked relationships with TAC committee to discuss the validity of interpretations. ITN Reference 7.6.3.6.3 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Submit Final Report and Recommendations to the Department. These materials are secure, and therefore contractor shall post them to SFTP. (2) Provide Department email reflecting receipt and approval of the documents and files. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2015; Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Development o...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2015; Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Development of a study plan for the linking Florida Standards Assessments to International Assessments. The Contractor’s plan will include, review of the most promising and most feasible methods likely to be used in international linking, discuss the technical feasibility of each method given the nature and design of the Florida Standards Assessments and those of international assessments such as PISA and TIMSS, propose method(s) for linking the scales of assessments, propose alternative ways for collecting data, explain the process of establishing the linking relationship(s) in detail, and provide a comprehensive and detailed timeline for all tasks and events, as described in section 7.6.3.9. The contractor will share the report with the Department and its TAC members. Upon approval from the Department, the contractor will finalize the plan for the linking. ITN Reference 7.6.3.6.3 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) The plan for conducting the linking study is secure, and therefore contractor shall post them to SFTP. (2) Provide Department email reflecting receipt and approval of the study specifications. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
August 2016; Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Linking Florida...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: August 2016; Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Linking Florida Standards Assessments to other assessments. "Conducting all of the planned analyses, preparing a final technical report, and sharing the results of linked relationships with TAC committee to discuss the validity of interpretations. ITN Reference 7.6.3.6.2 |
| Deliverable Price: $10,964.00 |
| Non Price Justification: |
| Performance Metrics: (1) Submit Final Report and Recommendations (secure files) to the Department via SFTP. (2) Provide Department email reflecting receipt and approval of the documents and files. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2015; Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Development o...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2015; Scaling, Equating, Scoring, and Special Psychometric Studies: Periodic: Development of a study plan for linking Florida Standards Assessments to other assessments measuring the same standards. "Preparing a detailed plan for conducting the linking study. The plan will include a comprehensive and detailed timeline for all tasks and events, as described in section 7.6.3.8 The plan must be vetted by TAC members. The plan will include a review of the most promising and most feasible methods in linking, discuss the technical feasibility of such methods, and explain the process of establishing the linking relationship(s) in detail. ITN Reference 7.6.3.6.2 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) The plan for conducting comparability study is secure, and therefore contractor shall post them to SFTP. (2) Provide Department email reflecting receipt and approval of the study specifications. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|