| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
November 2016; Scoring and Reporting: Fall EOC: Handscoring of Performance Tasks. Handscoring refers...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: November 2016; Scoring and Reporting: Fall EOC: Handscoring of Performance Tasks. Handscoring refers to the processes necessary for determining the rating of a student’s response on the writing prompts or on the performance-based tasks in ELA/L and Mathematics that respondents may propose. Both paper-based and computer-based tests will contain performance tasks, and so the Contractor must have the capability to score both hand-written and key-entered student responses. The Department requires handscoring processes that are reliable and valid, as well as efficient in terms of time and expenditures. The handscoring process must follow the handscoring specifications. The final handscoring report, as described in the ITN, is required as evidence for payment. ITN Reference 7.5.4.5 |
| Deliverable Price: $8,556.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring report. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
January 2016; Scoring and Reporting: Winter EOC: Handscoring of Performance Tasks. Handscoring refer...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: January 2016; Scoring and Reporting: Winter EOC: Handscoring of Performance Tasks. Handscoring refers to the processes necessary for determining the rating of a student’s response on the writing prompts or on the performance-based tasks in ELA/L and Mathematics that respondents may propose. Both paper-based and computer-based tests will contain performance tasks, and so the Contractor must have the capability to score both hand-written and key-entered student responses. The Department requires handscoring processes that are reliable and valid, as well as efficient in terms of time and expenditures. The handscoring process must follow the handscoring specifications. The final handscoring report, as described in the ITN, is required as evidence for payment. ITN Reference 7.5.4.5 |
| Deliverable Price: $8,658.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring report.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
January 2017; Scoring and Reporting: Winter EOC: Handscoring of Performance Tasks. Handscoring refer...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: January 2017; Scoring and Reporting: Winter EOC: Handscoring of Performance Tasks. Handscoring refers to the processes necessary for determining the rating of a student’s response on the writing prompts or on the performance-based tasks in ELA/L and Mathematics that respondents may propose. Both paper-based and computer-based tests will contain performance tasks, and so the Contractor must have the capability to score both hand-written and key-entered student responses. The Department requires handscoring processes that are reliable and valid, as well as efficient in terms of time and expenditures. The handscoring process must follow the handscoring specifications. The final handscoring report, as described in the ITN, is required as evidence for payment. ITN Reference 7.5.4.5 |
| Deliverable Price: $5,957.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring report.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed.
|
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2015; Scoring and Reporting: Spring EOC: Handscoring of Performance Tasks. Handscoring refers t...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2015; Scoring and Reporting: Spring EOC: Handscoring of Performance Tasks. Handscoring refers to the processes necessary for determining the rating of a student’s response on the writing prompts or on the performance-based tasks in ELA/L and Mathematics that respondents may propose. Both paper-based and computer-based tests will contain performance tasks, and so the Contractor must have the capability to score both hand-written and key-entered student responses. The Department requires handscoring processes that are reliable and valid, as well as efficient in terms of time and expenditures. The handscoring process must follow the handscoring specifications. The final handscoring report, as described in the ITN, is required as evidence for payment. ITN Reference 7.5.4.5 |
| Deliverable Price: $296,152.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring report. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2016; Scoring and Reporting: Spring EOC: Handscoring of Performance Tasks. Handscoring refers t...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2016; Scoring and Reporting: Spring EOC: Handscoring of Performance Tasks. Handscoring refers to the processes necessary for determining the rating of a student’s response on the writing prompts or on the performance-based tasks in ELA/L and Mathematics that respondents may propose. Both paper-based and computer-based tests will contain performance tasks, and so the Contractor must have the capability to score both hand-written and key-entered student responses. The Department requires handscoring processes that are reliable and valid, as well as efficient in terms of time and expenditures. The handscoring process must follow the handscoring specifications. The final handscoring report, as described in the ITN, is required as evidence for payment. ITN Reference 7.5.4.5 |
| Deliverable Price: $346,857.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring report.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
July 2015; Scoring and Reporting: Summer EOC: Handscoring of Performance Tasks. Handscoring refers t...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: July 2015; Scoring and Reporting: Summer EOC: Handscoring of Performance Tasks. Handscoring refers to the processes necessary for determining the rating of a student’s response on the writing prompts or on the performance-based tasks in ELA/L and Mathematics that respondents may propose. Both paper-based and computer-based tests will contain performance tasks, and so the Contractor must have the capability to score both hand-written and key-entered student responses. The Department requires handscoring processes that are reliable and valid, as well as efficient in terms of time and expenditures. The handscoring process must follow the handscoring specifications. The final handscoring report, as described in the ITN, is required as evidence for payment. ITN Reference 7.5.4.5 |
| Deliverable Price: $11,260.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring report. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
July 2016; Scoring and Reporting: Summer EOC: Handscoring of Performance Tasks. Handscoring refers t...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: July 2016; Scoring and Reporting: Summer EOC: Handscoring of Performance Tasks. Handscoring refers to the processes necessary for determining the rating of a student’s response on the writing prompts or on the performance-based tasks in ELA/L and Mathematics that respondents may propose. Both paper-based and computer-based tests will contain performance tasks, and so the Contractor must have the capability to score both hand-written and key-entered student responses. The Department requires handscoring processes that are reliable and valid, as well as efficient in terms of time and expenditures. The handscoring process must follow the handscoring specifications. The final handscoring report, as described in the ITN, is required as evidence for payment. ITN Reference 7.5.4.5 |
| Deliverable Price: $10,680.00 |
| Non Price Justification: |
| Performance Metrics: (1) Provide Department email reflecting approval of the final handscoring report. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2016; Scoring and Reporting: Fall ELA/L Retake: Final Report Mockups: Development of the report...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2016; Scoring and Reporting: Fall ELA/L Retake: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
February 2016; Scoring and Reporting: Spring ELA/L Retake: Final Report Mockups: Development of the ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: February 2016; Scoring and Reporting: Spring ELA/L Retake: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $1,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
February 2017; Scoring and Reporting: Spring ELA/L Retake: Final Report Mockups: Development of the ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: February 2017; Scoring and Reporting: Spring ELA/L Retake: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
February 2015; Scoring and Reporting: Spring ELA/L and Mathematics: Final Report Mockups: Developmen...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: February 2015; Scoring and Reporting: Spring ELA/L and Mathematics: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $35,283.00 |
| Non Price Justification: |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
February 2016; Scoring and Reporting: Spring ELA/L and Mathematics: Final Report Mockups: Developmen...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: February 2016; Scoring and Reporting: Spring ELA/L and Mathematics: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
February 2017; Scoring and Reporting: Spring ELA/L and Mathematics: Final Report Mockups: Developmen...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: February 2017; Scoring and Reporting: Spring ELA/L and Mathematics: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
June 2016; Scoring and Reporting: Fall EOC: Final Report Mockups: Development of the report mockups ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: June 2016; Scoring and Reporting: Fall EOC: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
October 2015; Scoring and Reporting: Winter EOC: Final Report Mockups: Development of the report moc...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: October 2015; Scoring and Reporting: Winter EOC: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
October 2016; Scoring and Reporting: Winter EOC: Final Report Mockups: Development of the report moc...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: October 2016; Scoring and Reporting: Winter EOC: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
March 2015; Scoring and Reporting: Spring EOC: Final Report Mockups: Development of the report mocku...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: March 2015; Scoring and Reporting: Spring EOC: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $9,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
March 2016; Scoring and Reporting: Spring EOC: Final Report Mockups: Development of the report mocku...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: March 2016; Scoring and Reporting: Spring EOC: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
March 2017; Scoring and Reporting: Spring EOC: Final Report Mockups: Development of the report mocku...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: March 2017; Scoring and Reporting: Spring EOC: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
April 2016; Scoring and Reporting: Summer EOC: Final Report Mockups: Development of the report mocku...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: April 2016; Scoring and Reporting: Summer EOC: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
April 2017; Scoring and Reporting: Summer EOC: Final Report Mockups: Development of the report mocku...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: April 2017; Scoring and Reporting: Summer EOC: Final Report Mockups: Development of the report mockups for all assessments. The contractor will post the final approved report mockups for all assessments to the SFTP. ITN Reference 7.5.5 |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: (1) Final set of approved report mockups posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the report mockups. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2015; Scoring and Reporting: Fall ELA/L Retake: Development of the history files for EOC an...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2015; Scoring and Reporting: Fall ELA/L Retake: Development of the history files for EOC and ELA/Mathematics. The contractor will create and update history files after each test administration using the requirements specified in the SR specifications. ITN Reference 7.5.4.2 |
| Deliverable Price: $2,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) History files posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the history data files.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
December 2016; Scoring and Reporting: Fall ELA/L Retake: Development of the history files for EOC an...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: December 2016; Scoring and Reporting: Fall ELA/L Retake: Development of the history files for EOC and ELA/Mathematics. The contractor will create and update history files after each test administration using the requirements specified in the SR specifications. ITN Reference 7.5.4.2 |
| Deliverable Price: $2,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) History files posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the history data files.
|
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
October 2016; Scoring and Reporting: Spring ELA/L Retake: Development of the history files for EOC a...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: October 2016; Scoring and Reporting: Spring ELA/L Retake: Development of the history files for EOC and ELA/Mathematics. The contractor will create and update history files after each test administration using the requirements specified in the SR specifications. ITN Reference 7.5.4.2 |
| Deliverable Price: $4,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) History files posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the history data files. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|
|
|
|
EDUCATION & TRAINING CONSULTANT
|
October 2015; Scoring and Reporting: Spring ELA/L and Mathematics: Development of the history files ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: October 2015; Scoring and Reporting: Spring ELA/L and Mathematics: Development of the history files for EOC and ELA/Mathematics. The contractor will create and update history files after each test administration using the requirements specified in the SR specifications. ITN Reference 7.5.4.2 |
| Deliverable Price: $10,000.00 |
| Non Price Justification: |
| Performance Metrics: (1) History files posted to the SFTP. (2) Provide Department email reflecting receipt and approval of the history data files. |
| Financial Consequences: The Contract Manager shall periodically review the progress made on the deliverables listed in Attachment B, Exhibit 1. If the Contractor fails to meet and comply with the deliverables established in the Contract or to make appropriate progress on contract deliverables the Contract Manager may apply the financial consequences included below. Accurate and timely delivery is imperative and, as a result, the Contract will include the following provisions for the completion of the work and Deliverables identified in the Contract.: 1)The Contract Manager may approve a partial invoice payment for the deliverables completed during the quarter; 2) If there are any incomplete deliverables due for the quarter included on the Contractor’s invoice – these will be deducted from the invoice; 3)The Contract Manager may request the Contractor redo the work related to a deliverable and adjust any invoice received by the amount of the deliverable. Payment will not be made until the work that must be redone is completed and approved by the Contract Manager; 4) The Contract Manager may apply Liquidated Damages as applicable; 5) All of the above or, 6) Terminate the Contract. The Contractor will be notified in writing concerning Department action(s), including specifics of the work not provided, the deliverable(s) considered to be incomplete and the partial amount to be paid based on the work completed. |
| Source Documentation Page Reference: Attachment B, Exhibit 1, & Attachment A, Page 15 |
| Deliverable Number: |
|