| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Electrical system services
|
Provide labor and material to perform miscellaneous high voltage, medium voltage, and other electric...
|
Cost Reimbursement Plus Percentage of Cost
|
| Major Deliverable: Provide labor and material to perform miscellaneous high voltage, medium voltage, and other electrical maintenance and repairs, replacements, and installation in above ground, underground, and exterior environments. Specifically, Contractor will provide a Switchgear Relay Technician/Engineer, Foreman, Journeyman and Helper, each for a flat hourly rate specified in Contractor's Proposal date May 7, 2015. The annual total cost of services shall not exceed $200,000. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Contractor shall perform services requested in conformity to the terms and specifications of the agreement, the general conditions, and Agency's duly authorized written request submitted to contractor on Form A, "FSDB Minor Project Scope", or a School Dude Work Order. Contractor shall deliver a detailed service ticket within 5 days after completion of each scheduled service in sufficient detail to allow a thorough inspection of the work performed. All services provided by Contractor must be verified and accepted in writing by Agency's Contract Manager within the times specified. |
| Financial Consequences: Contractor's failure to perform in accordance with the agreement to the satisfaction of Agency may result in cancellation of any portion of remaining work not completed at the time of non-performance and Agency's unilateral cancellation of the agreement. Fees and costs for work performed prior to non-performance that are verified, accepted and approved, will be paid. Any lump-sum amounts shall be prorated. Contractor's failure to complete all work and deliver all required documentation with the specified times will result in a deduction of one-half of one percent (1/2%) of the total contract cost for each day of delay. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Electrical system services
|
Mark Up percentages for materials and services for all years: Materials 15%, Subcontractors 10%.
|
Cost Reimbursement Plus Percentage of Cost
|
| Major Deliverable: Mark Up percentages for materials and services for all years: Materials 15%, Subcontractors 10%. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: Same as master agreement. |
| Financial Consequences: Same as master agreement. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Electrical system services
|
Specified rate of compensation for one truck with all tools and equipment for 2018-2019 and 2019-202...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Specified rate of compensation for one truck with all tools and equipment for 2018-2019 and 2019-2020: $13.00 per hour. |
| Deliverable Price: $13.00 |
| Non Price Justification: |
| Performance Metrics: Same as master agreement |
| Financial Consequences: Same as master agreement |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Electrical system services
|
New Data Power Room needs
1. Supply & Install 200 Amp ATS
2. Supply & Install 480v Breaker in Exist...
|
Fixed Price - Lump Sum
|
| Major Deliverable: New Data Power Room needs
1. Supply & Install 200 Amp ATS
2. Supply & Install 480v Breaker in Existing Switchboard
3. Supply & Install 50 KVA Transformer
4. Supply & Install All Under/Aboveground Conduit, Supports, and wire for 200 Amp Service
5. Supply & Install Generator Power for Battery Changer and Heater
6. Supply & lnstall125 amp UPS Sub Panel
7. Supply & Install (8) 20 amp receptacles in data building for equipment from UPS Panel.
8. All Associated Labor to Perform Work Listed Above |
| Deliverable Price: $37,000.00 |
| Non Price Justification: |
| Performance Metrics: The Contractor shall exercise all reasonable skill, care, and diligence in the performance of the Services and shall carry out all its/their obligations in accordance with generally accepted and recognized professional standards.
The Contractor shall make every effort to mobilize all the financial, human, and material resources required for full performance of the Services. (3) The Contractor shall at all times, in respect of any matter relating to this Contract or to the Services, act to protect the legitimate interests of FSDB and shall take all reasonable steps to keep all costs to a minimum and consistent with sound professional practices.
|
| Financial Consequences: Failure of Contractor to complete all work and deliver all required documentation within the times specified herein will result in a deduction for liquidated damages of one-half of one percent (1/2 %) of the total contract cost for each day of delay. FSDB shall not be responsible for any additional payments for labor, overtime or other, caused by Contractor's delay. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Electrical system services
|
Campus Lighting Project:
I. Providing & Installing (40) lighting fixture per the attached drawing
2....
|
Fixed Price - Lump Sum
|
| Major Deliverable: Campus Lighting Project:
I. Providing & Installing (40) lighting fixture per the attached drawing
2. Providing & Installing (2) 30' concrete, (2) 24' Aluminum (8) 12' Aluminum poles
J . All conduit, fittings, and supports as needed to install fixtures
4. Excavating and hackfilling
5. Underground handholcs where needed
6. Rental Equipment
7. Start-Up And Test |
| Deliverable Price: $69,000.00 |
| Non Price Justification: |
| Performance Metrics: The Contractor shall exercise all reasonable skill, care, and diligence in the performance of the Services and shall carry out all its/their obligations in accordance with generally accepted and recognized professional standards.
The Contractor shall make every effort to mobilize all the financial, human, and material resources required for full performance of the Services. (3) The Contractor shall at all times, in respect of any matter relating to this Contract or to the Services, act to protect the legitimate interests of FSDB and shall take all reasonable steps to keep all costs to a minimum and consistent with sound professional practices.
|
| Financial Consequences: Failure of Contractor to complete all work and deliver all required documentation within the times specified herein will result in a deduction for liquidated damages of one-half of one percent (1/2 %) of the total contract cost for each day of delay. FSDB shall not be responsible for any additional payments for labor, overtime or other, caused by Contractor's delay. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Building and Facility Construction and Maintenance Services
|
1. Supply & Install New 50kw Natural Gas Generator
2. Transportation/Unloading/Crane Rental/Setting ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: 1. Supply & Install New 50kw Natural Gas Generator
2. Transportation/Unloading/Crane Rental/Setting of New Generator
3. Supply & Install Conduit, Supports, And Wire for Generator
4. Supply & Install Generator Power for Battery Changer and Heater
5. Start-Up, Checkout, & Load Banking of New Generator
6. All Associated Labor to Perform Work Listed Above |
| Deliverable Price: $37,600.00 |
| Non Price Justification: |
| Performance Metrics: The Contractor shall exercise all reasonable skill, care, and diligence in the performance of the Services and shall carry out all its/their obligations in accordance with generally accepted and recognized professional standards.
The Contractor shall make every effort to mobilize all the financial, human, and material resources required for full performance of the Services. (3) The Contractor shall at all times, in respect of any matter relating to this Contract or to the Services, act to protect the legitimate interests of FSDB and shall take all reasonable steps to keep all costs to a minimum and consistent with sound professional practices.
|
| Financial Consequences: Failure of Contractor to complete all work and deliver all required documentation within the times specified herein will result in a deduction for liquidated damages of one-half of one percent (1/2 %) of the total contract cost for each day of delay. FSDB shall not be responsible for any additional payments for labor, overtime or other, caused by Contractor's delay. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Electrical system services
|
Specified rate of compensation for one Foreman for 2019-2020: Flat rate of $75.24 per hour. Overtime...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Specified rate of compensation for one Foreman for 2019-2020: Flat rate of $75.24 per hour. Overtime rate applies at $96.50 per hour. |
| Deliverable Price: $75.24 |
| Non Price Justification: |
| Performance Metrics: Same as master agreement |
| Financial Consequences: Same as Master agreement |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Electrical system services
|
Specified rate of compensation for one Journeyman for 2019-2020: Flat rate of $67.93 per hour. Overt...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Specified rate of compensation for one Journeyman for 2019-2020: Flat rate of $67.93 per hour. Overtime rate applies at $86.42 per hour. |
| Deliverable Price: $67.93 |
| Non Price Justification: |
| Performance Metrics: Same as master agreement |
| Financial Consequences: Same as master agreement |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Electrical system services
|
Specified rate of compensation for one Helper for 2019-2020: Flat rate of $37.30 per hour. Overtime ...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Specified rate of compensation for one Helper for 2019-2020: Flat rate of $37.30 per hour. Overtime rate applies at $48.37 per hour. |
| Deliverable Price: $37.30 |
| Non Price Justification: |
| Performance Metrics: Same as master agreement |
| Financial Consequences: Same as master agreement |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Electrical system services
|
Specified rate of compensation for one Switchgear Relay Technician for 2019-2020: Flat Rate of $128....
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Specified rate of compensation for one Switchgear Relay Technician for 2019-2020: Flat Rate of $128.00 per hour. Overtime rate applies at $187.00 per hour. |
| Deliverable Price: $128.00 |
| Non Price Justification: |
| Performance Metrics: Same as master agreement |
| Financial Consequences: Same as master agreement |
| Source Documentation Page Reference: |
| Deliverable Number: |
|