Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Building construction management
|
17212 (1) - Base Bid South, Per Solicitation FWC 17 18-64C:
South Side of Roadway Construct storm wa...
|
Fixed Price - Lump Sum
|
| Major Deliverable: 17212 (1) - Base Bid South, Per Solicitation FWC 17 18-64C:
South Side of Roadway Construct storm water swales and drainage structures as indicated within a light green hatch on sheet C-4.01. Drawing set Tenoroc South Improvements Access Road is included and provides plans and details for this work. Drawing set is part of a larger drawing set containing work that is not in this contract (N.I.C.). |
| Deliverable Price: $73,000.00 |
| Non Price Justification: |
| Performance Metrics: Contractor shall complete Base Bid South – Item 1 specified in Attachment A-Scope of Work. FWC shall pay Contractor only after the FWC Construction Administrator has verified and approved work completed as identified in the Schedule of Values/Deliverables for the service period. Application for Certification and Payment shall be submitted using, AIA Version 1 (March 2014) Form G702 and G703. The FWC Construction Administrator will confirm completed work and sign and seal the
Application for Payment. Application for Payment may be made to the FWC on a monthly basis. |
| Financial Consequences: FWC shall be entitled to assess, as liquidated damages, but not as a penalty, $100 for each calendar day thereafter
until substantial completion is achieved. FWC will retain 10% of all approved Applications for Payment. This
retainage will be paid to CONTRACTOR at the time that all work is complete and punch list items corrected to the
satisfaction of FWC. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Building construction management
|
17212 (2) - Base Bid North, Per Solicitation FWC 17 18-64C:
North Side of Roadway
Construct entrance...
|
Fixed Price - Lump Sum
|
| Major Deliverable: 17212 (2) - Base Bid North, Per Solicitation FWC 17 18-64C:
North Side of Roadway
Construct entrance road from station 10+00 to station 20 + 00 as indicated on sheet C-1. Construct concrete ADA parking
spaces as shown on drawings. Construct storm water pond as indicated on sheet C - 10. Construction shall include all
grading, compaction, material, drainage swales, storm drain pipe and structures adjacent to proposed work for a
functional driveway and storm water pond per drawings. |
| Deliverable Price: $171,596.56 |
| Non Price Justification: |
| Performance Metrics: Contractor shall complete Base Bid North – Item 2 specified in Attachment A-Scope of Work. FWC shall pay Contractor only after the FWC Construction Administrator has verified and approved work completed as identified in the Schedule of Values/Deliverables for the service period. Application for Certification and Payment shall be submitted using, AIA Form G702 and G703. The FWC Construction Administrator will confirm completed work and sign and seal the Application for Payment. Application for Payment may be made to the FWC on a monthly basis. |
| Financial Consequences: FWC shall be entitled to assess, as liquidated damages, but not as a penalty, $100 for each calendar day thereafter
until substantial completion is achieved. FWC will retain 10% of all approved Applications for Payment. This
retainage will be paid to CONTRACTOR at the time that all work is complete and punch list items corrected to the
satisfaction of FWC. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Building construction management
|
17212 (3) - Additive Alternate 1 , Per Solicitation FWC 17 18-64C: Construct gravel roadway as indic...
|
Fixed Price - Lump Sum
|
| Major Deliverable: 17212 (3) - Additive Alternate 1 , Per Solicitation FWC 17 18-64C: Construct gravel roadway as indicated on drawings (south side of roadway). |
| Deliverable Price: $11,500.00 |
| Non Price Justification: |
| Performance Metrics: Contractor shall complete Additive Alternate 1 – Item 3 specified in Attachment A-Scope of Work. FWC shall pay
Contractor only after the FWC Construction Administrator has verified and approved work completed as identified in
the Schedule of Values/Deliverables for the service period. Application for Certification and Payment shall be
submitted using, AIA Form G702 and G703. The FWC Construction Administrator will confirm completed work and sign and seal the Application for Payment. Application for Payment may be made to the FWC on a monthly basis. |
| Financial Consequences: FWC shall be entitled to assess, as liquidated damages, but not as a penalty, $100 for each calendar day thereafter
until substantial completion is achieved. FWC will retain 10% of all approved Applications for Payment. This
retainage will be paid to CONTRACTOR at the time that all work is complete and punch list items corrected to the
satisfaction of FWC. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Building construction management
|
Mod1 (4) - North Side of Roadway Excavate and relocate extra fill per the Southwest Florida Water Ma...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Mod1 (4) - North Side of Roadway Excavate and relocate extra fill per the Southwest Florida Water Management requirements and permit. |
| Deliverable Price: $17,620.16 |
| Non Price Justification: |
| Performance Metrics: Contractor shall expand the storm water treatment pond, indicated on sheet C – 10, by excavating 3239 cu. yards of fill and relocate it onsite. FWC shall pay Contractor only after the FWC Construction Administrator has verified and
approved work completed as identified in the SWFWMD Permit and Change Order 1 guidelines. Application for
Certification and Payment shall be submitted using, AIA Form G702 and G703. The FWC Construction Administrator
will confirm completed work and sign and seal the Application for Payment. Application for Payment may be made to the FWC on a monthly basis. |
| Financial Consequences: FWC shall be entitled to assess, as liquidated damages, but not as a penalty, $100 for each calendar day thereafter
until substantial completion is achieved. FWC will retain 10% of all approved Applications for Payment. This
retainer will be paid to CONTRACTOR at the time that all work is complete and punch list items corrected to the
satisfaction of FWC. |