Land rehabilitation services
|
TA1 - Contracted services for exotic vegetation removal, minor excavation, planting, and maintenan...
|
Cost Reimbursement
|
| Major Deliverable: TA1 - Contracted services for exotic vegetation removal, minor excavation, planting, and maintenance for a project identified as “Robinson Preserve Expansion Phase III Restoration” covering approximately 22.54 acres. |
| Deliverable Price: $110,000.00 |
| Non Price Justification: |
| Performance Metrics: CONTRACTOR shall complete estuarine habitat enhancement services based upon the issued Task Assignment(s) or Task Assignment Change Order(s). The COMMISSION will review submitted invoices for estuarine enhancement components of this project including suppression of undesirable vegetation, establishment of desirable vegetation, appropriate elevations and hydrological connection.
1 – Cedar Hammock: Herbicide applications, planting, staking, and mulching over 4.54 acres. Listing of all plants installed. Tabulated herbicide application data as it applies: herbicides and adjuvants used to complete the task.
At least 3 representative photographs of work performed on the site.
2 – Coastal Hammock and Cabbage Palm Island: Herbicide applications, planting, staking, and mulching over 3.32 acres. Listing of all plants installed. Tabulated herbicide application data as it applies: herbicides and adjuvants used to complete the task. At least 3 representative photographs of work performed on the site.
3 – Live Oak Hammock: Herbicide applications, planting, staking, and mulching over 14.68 acres. Listing of all plants installed. Tabulated herbicide application data as it applies: herbicides and adjuvants used to complete the task.
At least 3 representative photographs of work performed on the site.
|
| Financial Consequences: If the CONTRACTOR fails to produce each deliverable within the time frame specified by the
Scope of Work, Attachment A, the budget amount allocated for that deliverable will be deducted
from the CONTRACTOR's Payment. The COMMISSION reserves the right to hold 10%
retainage for any deliverable until all project deliverables have been completed in entirety.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Land rehabilitation services
|
Estuarine habitat enhancement through suppression of undesirable vegetation, establishment of desira...
|
Cost Reimbursement
|
| Major Deliverable: Estuarine habitat enhancement through suppression of undesirable vegetation, establishment of desirable vegetation, appropriate elevations and hydrological connection as specified in Construction Plans as agreed to by the CONTRACTOR and the COMMISSION. |
| Deliverable Price: $600,000.00 |
| Non Price Justification: |
| Performance Metrics: The CONTRACTOR will provide final as-built survey data and before and after photographs of the site(s) where work is performed. The COMMISSION Project Manager will complete site visits to verify completion of performance. |
| Financial Consequences: If the CONTRACTOR fails to produce each deliverable within the time frame specified by the Scope of Work, the budget amount allocated for that deliverable will be deducted from the CONTRACTOR's Payment. The COMMISSION reserves the right to hold 10% retainage for any deliverables until all project deliverables have been completed in entirety. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Land rehabilitation services
|
TA2 - Contracted services for exotic vegetation removal, minor excavation, planting, and maintenanc...
|
Cost Reimbursement
|
| Major Deliverable: TA2 - Contracted services for exotic vegetation removal, minor excavation, planting, and maintenance for a project identified as “Robinson Preserve Expansion Phase III Restoration” covering approximately 22.54 acres. |
| Deliverable Price: $300,329.74 |
| Non Price Justification: |
| Performance Metrics: CONTRACTOR shall complete estuarine habitat enhancement services based upon the issued Task Assignment(s) or Task Assignment Change Order(s). The COMMISSION will review submitted invoices for estuarine enhancement components of this project including suppression of undesirable vegetation, establishment of desirable vegetation, appropriate elevations and hydrological connection.
1 – Coastal Prairie: Herbicide applications, mowing, planting, and watering over 9.02 acres. Listing of all plants installed. Tabulated herbicide application data as it applies: herbicides and adjuvants used to complete the task.
At least 3 representative photographs of work performed on the site.
2 – Pine Flatwoods: Herbicide applications, mowing, planting, staking, watering and mulching over 7.32 acres. Listing of all plants installed. Tabulated herbicide application data as it applies: herbicides and adjuvants used to complete the task. At least 3 representative photographs of work performed on the site.
3 – Remainder Live Oak and Cedar Hammock: Herbicide applications, mowing, planting, staking, watering and mulching over 10.48 acres. Listing of all plants installed. Tabulated herbicide application data as it applies: herbicides and adjuvants used to complete the task.
At least 3 representative photographs of work performed on the site.
|
| Financial Consequences: FINANCIAL CONSEQUENCES
If the Contractor fails to meet the established minimum performance level for the given deliverable, the FFWCC may reduce payment by 10%. Allowance will be made for non-compliance to minimum levels if the reason is due to circumstances beyond the Contractor’s control.
Additionally, if the Contractor materially fails to comply with the terms and conditions of this Contract, including any Federal or state statutes, rules, or regulations applicable to this Contract, the Commission may take one or more of the following actions; as appropriate for the circumstances:
a. Temporarily withhold cash payments pending corrections of the deficiency by the Contractor.
b. Disallow all or part of the cost of the activity or action not in compliance.
c. Wholly or partially suspend or terminate this Contract.
d. Withhold further awards for the project or program.
e. Take other remedies that may be legally available.
|
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Land rehabilitation services
|
TA3 - Contracted services for minor excavation, planting, staking, watering, and mulching for a proj...
|
Cost Reimbursement
|
| Major Deliverable: TA3 - Contracted services for minor excavation, planting, staking, watering, and mulching for a project identified as “Robinson Preserve Expansion Phase III Restoration” per Manatee County Scope of Work to be prepared for work to begin in August 2021 covering approximately 1 acre. |
| Deliverable Price: $108,670.26 |
| Non Price Justification: |
| Performance Metrics: CONTRACTOR shall complete estuarine habitat enhancement services based upon the issued Task Assignment(s) or Task Assignment Change Order(s). The COMMISSION will review submitted invoices for estuarine enhancement components of this project including suppression of undesirable vegetation, establishment of desirable vegetation, appropriate elevations and hydrological connection.
1 – Mulching: Blown mulch over approximately 1 acre. Listing of mulch quantity used, in cubic yards. At least 3 representative photographs of work performed on the site.
2 – Erosion and Screening Plantings: Planting over approximately 1 acre. Listing of all plants installed. At least 3 representative photographs of work performed on the site.
3 – Cabbage Palm Plantings: Planting, staking, watering, and mulching over approximately 1 acre. Listing of all palms installed. At least 3 representative photographs of work performed on the site.
|
| Financial Consequences: FINANCIAL CONSEQUENCES
If the Contractor fails to meet the established minimum performance level for the given deliverable, the FFWCC may reduce payment by 10%. Allowance will be made for non-compliance to minimum levels if the reason is due to circumstances beyond the Contractor’s control.
Additionally, if the Contractor materially fails to comply with the terms and conditions of this Contract, including any Federal or state statutes, rules, or regulations applicable to this Contract, the Commission may take one or more of the following actions; as appropriate for the circumstances:
a. Temporarily withhold cash payments pending corrections of the deficiency by the Contractor.
b. Disallow all or part of the cost of the activity or action not in compliance.
c. Wholly or partially suspend or terminate this Contract.
d. Withhold further awards for the project or program.
e. Take other remedies that may be legally available.
|
| Source Documentation Page Reference: |