Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Fisheries and aquaculture
|
Provide all materials, equipment, labor, supervision, and transportation to construct a new eelgrass...
|
Fixed Price - Lump Sum
|
| Major Deliverable: Provide all materials, equipment, labor, supervision, and transportation to construct a new eelgrass production facility at
the Florida Bass Conservation Center per the plans and specifications. |
| Deliverable Price: $1,994,630.00 |
| Non Price Justification: |
| Performance Metrics: In accordance with the General Terms and Conditions, the number of days from Notice to Proceed with Construction to
Substantial Completion shall be two hundred (200) calendar days and Final Completion shall be fifteen (30) calendar
days thereafter. |
| Financial Consequences: In accordance with the General Terms and Conditions, the Liquidated Damages amount for Substantial Completion
is $250 per calendar day. Between Substantial Completion and Final Completion, Liquidated Damages will be $125
per calendar day. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Fisheries and aquaculture
|
CO1 - Additional fill is required for Pond 65 backfill and eelgrass facility foundation based on a d...
|
Fixed Price - Lump Sum
|
| Major Deliverable: CO1 - Additional fill is required for Pond 65 backfill and eelgrass facility foundation based on a discrepancy in the existing and proposed contours on the plans. This discrepancy was not discovered until construction of the project was underway. The contractor could not have identified this discrepancy during bidding. This change order includes all material, equipment, and labor to complete the project as intended while addressing the discrepancy on the construction plans, per the Contractor’s Change Order Proposal dated 3/18/2024. |
| Deliverable Price: $52,663.00 |
| Non Price Justification: |
| Performance Metrics: In accordance with the General Terms and Conditions, the number of days from Notice to Proceed with Construction to Substantial Completion shall be two hundred (200) calendar days and Final Completion shall be fifteen (30) calendar days thereafter. |
| Financial Consequences: In accordance with the General Terms and Conditions, the Liquidated Damages amount for Substantial Completion is $250 per calendar day. Between Substantial Completion and Final Completion, Liquidated Damages will be $125 per calendar day. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Fisheries and aquaculture
|
CO2 - Fill pond an additional 30 feet and add base rock to expand entry drive.
Provide 8 bollards at...
|
Fixed Price - Lump Sum
|
| Major Deliverable: CO2 - Fill pond an additional 30 feet and add base rock to expand entry drive.
Provide 8 bollards at various locations around the production facility: 2 at each overhead door, one at each of the east corners and 2 along the east wall. Change Order 2 Proposal dated 10/2/2024. |
| Deliverable Price: $59,944.00 |
| Non Price Justification: |
| Performance Metrics: In accordance with the General Terms and Conditions, the number of days from Notice to Proceed with Construction to Substantial Completion shall be two hundred (200) calendar days and Final Completion shall be fifteen (30) calendar days thereafter. |
| Financial Consequences: In accordance with the General Terms and Conditions, the Liquidated Damages amount for Substantial Completion is $250 per calendar day. Between Substantial Completion and Final Completion, Liquidated Damages will be $125 per calendar day. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Fisheries and aquaculture
|
CO3 - Upgrade control panel for primary water pumps to meet NEMA 3 per FWC’s request Change Order 3 ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: CO3 - Upgrade control panel for primary water pumps to meet NEMA 3 per FWC’s request Change Order 3 Proposal dated 12/9/2024. |
| Deliverable Price: $27,590.00 |
| Non Price Justification: |
| Performance Metrics: In accordance with the General Terms and Conditions, the number of days from Notice to Proceed with Construction to Substantial Completion shall be two hundred (200) calendar days and Final Completion shall be fifteen (30) calendar days thereafter. |
| Financial Consequences: In accordance with the General Terms and Conditions, the Liquidated Damages amount for Substantial Completion is $250 per calendar day. Between Substantial Completion and Final Completion, Liquidated Damages will be $125 per calendar day. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|