| More |
Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
TA1 - To compile files of the final permits, permit modifications, plans, and supporting materials r...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA1 - To compile files of the final permits, permit modifications, plans, and supporting materials required for procurement coordination of the HEI project per their proposal
dated 12/3/2025. |
| Deliverable Price: $5,759.00 |
| Non Price Justification: |
| Performance Metrics: If contractor fail to complete the subtask(s) in the critical path for project success by the Due Date noted above a financial consequence is instituted. |
| Financial Consequences: FWC shall assess $10 for each calendar day after due date until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA2-Provide a desktop review to evaluate the feasibility of hydrologic connectivity for seasonal flo...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA2-Provide a desktop review to evaluate the feasibility of hydrologic connectivity for seasonal flows from the Bond Farm Hydrological Enhancement Project through the 600-acre Charlotte, LLC parcels to support the restoration of the historical hydroperiod within Yucca Pens and Babcock Webb WMA, per the proposal dated 12/12/2025. |
| Deliverable Price: $24,767.00 |
| Non Price Justification: |
| Performance Metrics: If contractor fail to complete the subtask(s) in the critical path for project success by the Due Date noted above a financial consequence is instituted. |
| Financial Consequences: FWC shall assess $25 for each calendar day after due date until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA1CO1 - To extend the due dates for the compiled files to allow HDR to update electric plans at FWC...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA1CO1 - To extend the due dates for the compiled files to allow HDR to update electric plans at FWC request per their proposal dated 1/21/2026. |
| Deliverable Price: $0.00 |
| Non Price Justification: Agreement without a financial exchange or impact |
| Performance Metrics: If contractor fail to complete the subtask(s) in the critical path for project success by the Due Date noted above a financial consequence is instituted. |
| Financial Consequences: FWC shall assess $10 for each calendar day after due date until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA2CO1 - Update the due dates to incorporate conceptual allowances as discussed with Charlotte 1000 ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA2CO1 - Update the due dates to incorporate conceptual allowances as discussed with Charlotte 1000 engineering consultant per their proposal dated 04/01/2026. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: If contractor fail to complete the subtask(s) in the critical path for project success by the Due Date noted above a financial consequence is instituted. |
| Financial Consequences: FWC shall assess $25 for each calendar day after due date until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA4 - Financial Consequence - Task 3.2 was submitted 1 day late with a financial consequence at a ra...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA4 - Financial Consequence - Task 3.2 was submitted 1 day late with a financial consequence at a rate of $60/day. Unencumber $60.00 |
| Deliverable Price: ($60.00) |
| Non Price Justification: |
| Performance Metrics: If contractor fail to complete the subtask(s) in the critical path for project success by the Due Date noted above a financial consequence is instituted. |
| Financial Consequences: FWC shall assess $60 for each calendar day after due date until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA9-Continued monitoring of water level data and continued maintenance of the stations per their pro...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA9-Continued monitoring of water level data and continued maintenance of the stations per their proposal dated 9/14/2026. |
| Deliverable Price: $83,609.81 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Progress payments shall be based on actual work completed. They may be submitted monthly or on an alternate schedule per the Consultant’s billing processes. In any case, invoices for all completed work shall be submitted within 14 calendar days of the end date of the TA. Pay requests shall be submitted in accordance with these contract documents to the attention of the Owner designee. Backup material in the form of a schedule of values or equivalent approved by the Owner, shall be attached to the pay request. |
| Financial Consequences: Should the Contractor fail to complete the subtask(s) in the critical path for project success (1.1a, 1.1b, 1.1c & 1.1d), by the Due Date noted above, FWC shall assess $60 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
Documentation of fulfillment of professional services for various projects as outlined in related Ta...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Documentation of fulfillment of professional services for various projects as outlined in related Task Assignment. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: If Contractor fails to produce each deliverable within the time frame specified in the TA or CO, the budget amount allocated for that deliverable will be deducted from Contractor’s payment. The Commission shall apply any additional financial consequences identified in the TA or CO. |
| Financial Consequences: If Contractor fails to produce each deliverable within the time frame specified in the TA or CO, the budget amount allocated for that deliverable will be deducted from Contractor’s payment. The Commission shall apply any additional financial consequences identified in the TA or CO. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA4-Perform tasks related to threatened and endangered species surveys and monitoring as required pr...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA4-Perform tasks related to threatened and endangered species surveys and monitoring as required prior to construction under the new contract per their proposal dated 01/30/2026. This project is funded by NRDA and is FCO, so not tied to the FY. |
| Deliverable Price: $99,922.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: If contractor fail to complete the subtask(s) in the critical path for project success by the Due Date noted above a financial consequence is instituted. |
| Financial Consequences: FWC shall assess $60 for each calendar day after due date until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA5-Provide 60% design plans and permitting services for shoreline stabilization and spring head and...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA5-Provide 60% design plans and permitting services for shoreline stabilization and spring head and run dredging of Jenkins Creek per their proposal dated 02/10/2026. This scope of work builds on the previous data collection & monitoring tasks completed in April 2025 ~~and bathymetric survey, site characterization, sediment sampling, and 30-percent design work completed in January 2026. The goal is to remove any restrictions to manatee access to the
springhead area(s) during winter and stabilize the shoreline where necessary to eliminate sedimentation. |
| Deliverable Price: $99,747.54 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (4.2, 4.3, 5.1, 5.5, 6.1, 7.1.1, 7.1.2, 7.2.1.1, and 7.2.1.2), by the Due Date noted above, FWC shall assess a daily fee. |
| Financial Consequences: $60 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA6-ESA will provide permitting, agency coordination, engineering design development, and technical ...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA6-ESA will provide permitting, agency coordination, engineering design development, and technical documentation services for the project, including revision and submittal of state and federal permit applications with associated Requests for Additional Information support, coordination meetings with regulatory agencies, and wetland verification as required, progressive civil, structural, geotechnical, and stream restoration design from 60% through 100% completion with signed and sealed deliverables per their proposal dated 2/9/2026. |
| Deliverable Price: $33,576.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (1.4.1, 1.4.2, 2.1), by the Due Date noted above, FWC shall assess a daily fee. |
| Financial Consequences: $60 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA6CO1-This change order is to add an additional site visit to help with the conceptual design of th...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA6CO1-This change order is to add an additional site visit to help with the conceptual design of the project to get to 60% completion for the design plans. Also, an adjustment to the deliverable dates was extended for previous tasks, while moving other tasks to additional services to be completed next fiscal year per their proposal dated 04/07/2026. |
| Deliverable Price: ($2,181.00) |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (1.4.1, 1.4.2, 2.1), by the Due Date noted above, FWC shall assess a daily fee. |
| Financial Consequences: $60 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA7-The submittal and related permitting activities for the Bond Farm Hydrological Enhancement Impro...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA7-The submittal and related permitting activities for the Bond Farm Hydrological Enhancement Improvement (HEI) 404 permit, since jurisdiction switched from the Florida Department of Environmental Protection to United States Army Corps of Engineers (USACE), per their proposal dated 4/15/2026. |
| Deliverable Price: $77,800.86 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (1.1, 1.3a, 1.4a & 1.4c), by the Due Date noted above, FWC shall assess a daily fee. |
| Financial Consequences: $60 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA7CO1-Extend deliverable due dates to allow USACE review time per their proposal dated 05/26/2026.
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA7CO1-Extend deliverable due dates to allow USACE review time per their proposal dated 05/26/2026. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (1.1, 1.3a, 1.4a & 1.4c), by the Due Date noted above, FWC shall assess a daily fee. |
| Financial Consequences: $60 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA4CO1- Modifies Task 2.1 – Florida Bonneted Bat (FBB) and Red-Cockaded Woodpecker (RCW) Surveys bas...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA4CO1- Modifies Task 2.1 – Florida Bonneted Bat (FBB) and Red-Cockaded Woodpecker (RCW) Surveys based on direction from US Fish and Wildlife Services during the 6/9/2026 meeting, to be completed in support of the USACE Section 404 permit coordination, per their proposal dated 06/11/2026. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: If contractor fail to complete the subtask(s) in the critical path for project success by the Due Date noted above a financial consequence is instituted. |
| Financial Consequences: FWC shall assess $60 for each calendar day after due date until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA3-Through partnership with APEX Companies (formerly Water Science Associates), continued monitorin...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA3-Through partnership with APEX Companies (formerly Water Science Associates), continued monitoring efforts and data downloads for the sixty-four (64) Babcock
Webb and Yucca Pens Water Monitoring Stations for Quarters 3 and 4 of FY2026 per their proposal dated 01/30/2026. |
| Deliverable Price: $39,118.00 |
| Non Price Justification: |
| Performance Metrics: If contractor fail to complete the subtask(s) in the critical path (2.1, 2.2) for project success by the Due Date noted above a financial consequence is instituted. |
| Financial Consequences: FWC shall assess $40 for each calendar day after due date until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA6CO2-This change order request includes an additional 30-60 days for completion of certain tasks t...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA6CO2-This change order request includes an additional 30-60 days for completion of certain tasks to include: minutes for a pre-application meeting with the US Army Corps of Engineers (USACE) (Task 1.2.3), Meeting minutes and coordination emails post-application submittal (Task 1.2.1), and a Geotechnical Engineering Addendum Report (Task 2.2). Please see the revised schedule below. Costs per task and the overall cost are unchanged with this Change Order Request. A pre-application meeting with the USACE has been delayed pending a signed Agent Authorization form (Form ENG 6295) which was forwarded to FWC on 4/28/26 for signature. Permit submittals and follow-up coordination meetings will be performed following a pre-application meeting with the USACE to determine the best permitting pathway for the project, per their proposal dated 06/01/2026. |
| Deliverable Price: $0.00 |
| Non Price Justification: Rate Agreement |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (1.4.1, 1.4.2, 2.1), by the Due Date noted above, FWC shall assess a daily fee. |
| Financial Consequences: $60 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA8-ESA will be completing the tasks of submitting an FDEP permit application fee once FDEP has made...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA8-ESA will be completing the tasks of submitting an FDEP permit application fee once FDEP has made final determination of the project type and fee required. The Tasks also consist of preparing and submitting responses to FDEP and USACE requests for additional information per ESA’s proposal dated 08/06/2026. |
| Deliverable Price: $13,526.76 |
| Non Price Justification: |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (7.3.1), by the Due Date noted above, FWC shall assess a daily fee. |
| Financial Consequences: $10 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA5-The remaining tasks were not completed and will not be invoiced due to delays in feedback from t...
|
Fixed Price - Lump Sum
|
| Major Deliverable: TA5-The remaining tasks were not completed and will not be invoiced due to delays in feedback from the permitting agencies, outside of the consultant’s control. |
| Deliverable Price: ($19,956.76) |
| Non Price Justification: |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (4.2, 4.3, 5.1, 5.5, 6.1, 7.1.1, 7.1.2, 7.2.1.1, and 7.2.1.2), by the Due Date noted above, FWC shall assess a daily fee. |
| Financial Consequences: $60 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA10-ESA has proposed to accomplish final permitting through the Florida Department of Environmental...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA10-ESA has proposed to accomplish final permitting through the Florida Department of Environmental Protection (FDEP) and U.S. Army Corps of Engineers (USACE) as well as 100% Signed and Sealed drawings for the ConSpan Bridge and stream restoration, per their proposal dated 09/25/2026. |
| Deliverable Price: $145,374.00 |
| Non Price Justification: |
| Performance Metrics: Progress payments shall be based on actual work completed. They may be submitted monthly or on an alternate schedule per the Consultant’s billing processes. In any case, invoices for all completed work shall be submitted within 14 calendar days of the end date of the TA. Pay requests shall be submitted in accordance with these contract documents to the attention of the Owner designee. |
| Financial Consequences: Should the Contractor fail to complete the subtask(s) in the critical path for project success (2.1 & 2.2 subtasks numbers as needed), by the Due Date noted above, FWC shall assess $100 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|