Deliverable Number
|
Commodity/Service Type
|
Major Deliverable
|
Method of Payment
|
|
|
|
Professional engineering services
|
Documentation of fulfillment of professional services for various projects as outlined in related Ta...
|
Fixed Fee / Unit Rate
|
| Major Deliverable: Documentation of fulfillment of professional services for various projects as outlined in related Task Assignment. |
| Deliverable Price: $0.00 |
| Non Price Justification: Price cannot be determined until the work has been completed |
| Performance Metrics: If Contractor fails to produce each deliverable within the time frame specified in the TA or CO, the budget amount allocated for that deliverable will be deducted from Contractor’s payment. The Commission shall apply any additional financial consequences identified in the TA or CO. |
| Financial Consequences: If Contractor fails to produce each deliverable within the time frame specified in the TA or CO, the budget amount allocated for that deliverable will be deducted from Contractor’s payment. The Commission shall apply any additional financial consequences identified in the TA or CO. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA1-Stantec is to provide construction coordination and observation services from contractor selecti...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA1-Stantec is to provide construction coordination and observation services from contractor selection through close-out. They will coordinate pre-mobilization to confirm alignment with FWC requirements and will conduct periodic site visits during construction to observe activities for general conformance with approved plans and permits. Observation reports will be prepared throughout the project duration. Major construction is anticipated to span approximately 24 weeks, with planting activities occurring during the appropriate season, per their proposal dated 02/12/2026. |
| Deliverable Price: $111,052.00 |
| Non Price Justification: |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (2.09), by the Due Date noted above FWC shall assess a fee for each calendar day thereafter. |
| Financial Consequences: FWC shall assess $150 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA2-As-Built survey-related services to capture the location and general flow of the hand-dug channe...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA2-As-Built survey-related services to capture the location and general flow of the hand-dug channels at Fruit Farm Creek per their proposal dated 04/29/2026. |
| Deliverable Price: $11,623.00 |
| Non Price Justification: |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (2.0), by the Due Date noted above FWC shall assess a fee for each calendar day thereafter. |
| Financial Consequences: FWC shall assess $10 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA1CO1-Subtasks 2.08, 2.09 and 2.10 removed from TA due to the current construction schedule. It wil...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA1CO1-Subtasks 2.08, 2.09 and 2.10 removed from TA due to the current construction schedule. It will not be possible for consultant to complete those subtasks by the end date of the TA. |
| Deliverable Price: ($31,848.00) |
| Non Price Justification: |
| Performance Metrics: Should the Contractor fail to complete the subtask(s) in the critical path for project success (2.09), by the Due Date noted above FWC shall assess a fee for each calendar day thereafter. |
| Financial Consequences: FWC shall assess $150 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA3-Professional services during bidding of the replacement of the G-111 water control structure in ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA3-Professional services during bidding of the replacement of the G-111 water control structure in the Three Lakes Wildlife Management Area per the consultant’s proposal
dated 8/13/2026. |
| Deliverable Price: $16,004.00 |
| Non Price Justification: |
| Performance Metrics: Should the Contractor fail to complete the subtask in the critical path for project success (1), by the Due Date noted above, FWC shall assess a fee for each calendar day
thereafter until completion is achieved. |
| Financial Consequences: FWC shall assess $25.00 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |
| Deliverable Number: |
|
|
|
|
Professional engineering services
|
TA4-The consultant is to complete the remaining subtask related to services during construction for ...
|
Cost Reimbursement Plus Fixed Fee(s), including Fixed Price Components
|
| Major Deliverable: TA4-The consultant is to complete the remaining subtask related to services during construction for final project closeout, per their proposal dated 10/06/2026. |
| Deliverable Price: $12,182.00 |
| Non Price Justification: |
| Performance Metrics: Progress payments shall be based on actual work completed. They may be submitted monthly or on an alternate schedule per the Consultant’s billing processes. In any case, invoices for all completed work shall be submitted within 14 calendar days of the end date of the TA. |
| Financial Consequences: Should the Contractor fail to complete the subtask(s) in the critical path for project success (2.09 & 2.10), by the Due Date noted above, FWC shall assess $10 for each calendar day thereafter until completion is achieved. |
| Source Documentation Page Reference: |