LINE ITEM NUMBER
|
COMMODITY TYPE
|
STATE TERM CONTRACT ID
|
AGENCY SOLICITATION NUMBER
|
Quantity |
Unit Price |
Total Unit Price |
|
|
1
|
Mortar tuckpointing or restoration service
|
|
|
19197.1700
|
$1.0000
|
$19,197.17
|
| Wall Restoration: -Acquire permitting - Reconstruct Center Column/pillar and footer to match remainder of the wall, utilizing brick from damaged wall. -In lieu of rebuilding the section that was a s... |
| Line Item Description: Wall Restoration: -Acquire permitting - Reconstruct Center Column/pillar and footer to match remainder of the wall, utilizing brick from damaged wall. -In lieu of rebuilding the section that was a solid wall, fabricate and install a wrought iron fence that matches the remainder of the fence. -Repair the 2nd column that was damaged from impact. -ATHR (All Trades Historical Restoration) ensure the restoration work matches the existing (undamaged) wall. Total Cost: $19,197.17 (Street lamp and Electrical repair not included) Contractor is responsible for all supervision, labor, permits, materials, equipment, supplies, and cleanup required to complete this job. To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. Should additional work be required that is not included in the Scope of Work for this project due to unforeseen issues, Contractor will discuss with the Park Manager / Contract Manager and provide an itemized quote of the additional service (commodity). Once the additional work is agreed upon by both parties, the Park Manager / Contract Manager will submit a Change Order in MFMP, once approved, the additional work may be completed. No other Park employee is authorized to approve additional work. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37504015123 - |
| Object Code and Description: 242055 - |
| Account Code: 37-20-2-408001-37500300-00-080039-26 |
| Split Amount: $19,197.17 |
|
|
|
2
|
Mortar tuckpointing or restoration service
|
|
|
2343.7500
|
$1.0000
|
$2,343.75
|
| Engineering: PHASE I: Site Visit/ Condition Survey 1. Review any available documents and/or reports regarding the perimeter/boundary fencing of the property.. The above fees include expenses such a... |
| Line Item Description: Engineering: PHASE I: Site Visit/ Condition Survey 1. Review any available documents and/or reports regarding the perimeter/boundary fencing of the property.. The above fees include expenses such as mileage, copying, printing, etc. Requested and/or required services not listed above (additional services) will be performed and invoiced on an hourly basis per the attached Fee Schedule, or, if the client prefers, a separate proposal can be prepared for such additional services. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37504015123 - |
| Object Code and Description: 242055 - |
| Account Code: 37-20-2-408001-37500300-00-080039-26 |
| Split Amount: $2,343.75 |
|
|
|
3
|
Mortar tuckpointing or restoration service
|
|
|
4950.0000
|
$1.0000
|
$4,950.00
|
| Engineering: PHASE II: Construction Document Phase Based on the information collected in PHASE I as outlined above, Biller Reinhart anticipates the following design scope: 1. Prepare construction d... |
| Line Item Description: Engineering: PHASE II: Construction Document Phase Based on the information collected in PHASE I as outlined above, Biller Reinhart anticipates the following design scope: 1. Prepare construction documents (drawings and specifications) for the restoration of the damaged perimeter/boundary fencing, endeavoring to preserve the historic components. 2. The drawings will contain current building code information relevant to the project scope. The drawings will be signed and sealed by a licensed Florida Professional Engineer. The above fees include expenses such as mileage, copying, printing, etc. Requested and/or required services not listed above (additional services) will be performed and invoiced on an hourly basis per the attached Fee Schedule, or, if the client prefers, a separate proposal can be prepared for such additional services. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37504015123 - |
| Object Code and Description: 242055 - |
| Account Code: 37-20-2-408001-37500300-00-080039-26 |
| Split Amount: $4,950.00 |
|
|
|
4
|
Mortar tuckpointing or restoration service
|
|
|
11427.1700
|
$1.0000
|
$11,427.17
|
| Fabrication and Installation of additional brick column |
| Line Item Description: Fabrication and Installation of additional brick column |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37504015123 - |
| Object Code and Description: 242055 - |
| Account Code: 37-20-2-408001-37500300-00-080039-26 |
| Split Amount: $11,427.17 |
|