1
|
Plumbing system maintenance or repair
|
|
|
10.0000
|
$120.0000
|
$1,200.00
|
| Estimate # 1082771206 LIFT PUMP REPLACEMENT Remove 2 existing pumps in the lift station. Pumps will be pulled from the rail system, existing electrical connections disconnected and new pumps instal... |
| Line Item Description: Estimate # 1082771206 LIFT PUMP REPLACEMENT Remove 2 existing pumps in the lift station. Pumps will be pulled from the rail system, existing electrical connections disconnected and new pumps installed, properly seated, and secured on the guide rails. Reconnect wiring and verify correct rotation and operation. Replace 4 float switches. Install new floats at proper elevations for pump on, pump off, lag/alarm functions as required. Secure float cords to prevent interference or hang-ups. Estimate does not include unforeseen. Labor: (10) SLC Parks & Rec Repair/Replacement - Labor Per Hour @ $120.00 = $1,200.00 Total Price: $1,200.00 Contractor is responsible for all supervision, labor, permits, materials, equipment, supplies, and cleanup required to complete this job. To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. Should additional work be required that is not included in the Scope of Work for this project due to unforeseen issues, Contractor will discuss with the Park Manager / Contract Manager and provide an itemized quote of the additional service (commodity). Once the additional work is agreed upon by both parties, the Park Manager / Contract Manager will submit a Change Order in MFMP, once approved, the additional work may be completed. No other Park employee is authorized to approve additional work. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37505000106 - |
| Object Code and Description: 242055 - |
| Account Code: 37-20-2-675002-37500300-00-101198-00 |
| Split Amount: $1,200.00 |
|
|
|
2
|
Plumbing system maintenance or repair
|
|
|
1.0000
|
$5,094.6600
|
$5,094.66
|
| Estimate # 1082771206 / 1083657595 LIFT PUMP REPLACEMENT Remove 2 existing pumps in the lift station. Pumps will be pulled from the rail system, existing electrical connections disconnected and ne... |
| Line Item Description: Estimate # 1082771206 / 1083657595 LIFT PUMP REPLACEMENT Remove 2 existing pumps in the lift station. Pumps will be pulled from the rail system, existing electrical connections disconnected and new pumps installed, properly seated, and secured on the guide rails. Reconnect wiring and verify correct rotation and operation. Replace 4 float switches. Install new floats at proper elevations for pump on, pump off, lag/alarm functions as required. Secure float cords to prevent interference or hang-ups. Estimate does not include unforeseen. Lift Station Material: @ $5,094.66 2- 1.5HP non-clog pumps 208/230v, 10, 15 FLA with 3.00 vertical discharge, extended lift nails and 25 power cord 4-30 level control switches with 21bs of duct sealant 2 vertical discharge pipes and mount for the rail system Total Price: $5,094.66 Contractor is responsible for all supervision, labor, permits, materials, equipment, supplies, and cleanup required to complete this job. To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. Should additional work be required that is not included in the Scope of Work for this project due to unforeseen issues, Contractor will discuss with the Park Manager / Contract Manager and provide an itemized quote of the additional service (commodity). Once the additional work is agreed upon by both parties, the Park Manager / Contract Manager will submit a Change Order in MFMP, once approved, the additional work may be completed. No other Park employee is authorized to approve additional work. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37505000106 - |
| Object Code and Description: 242055 - |
| Account Code: 37-20-2-675002-37500300-00-101198-00 |
| Split Amount: $5,094.66 |
|