| More |
LINE ITEM NUMBER
|
COMMODITY TYPE
|
STATE TERM CONTRACT ID
|
AGENCY SOLICITATION NUMBER
|
Quantity |
Unit Price |
Total Unit Price |
|
|
1
|
Commercial and office building renovation and repair service
|
|
|
9250.0000
|
$1.0000
|
$9,250.00
|
| BL259007 - HOUSE - RECONSTRUCTION Contractor shall provide all labor, materials, equipment, supervision, and permitting to re-construct the Workshop at Werner Boyce Salt Springs Park due to saltwater... |
| Line Item Description: BL259007 - HOUSE - RECONSTRUCTION Contractor shall provide all labor, materials, equipment, supervision, and permitting to re-construct the Workshop at Werner Boyce Salt Springs Park due to saltwater storm surge from Hurricane Helene as per attached proposal. * Reconstruct the interior finishings of these offices and workshop areas. * Install R-13 insulation throughout the lower portion of walls. * Install new electrical outlets removing any water damaged outlets. * Install pressure treated plywood all the exterior walls 9' 4 . * Plywood to be screwed with galvanized screws. 1 x 4 Trim. * Install a 1 x 6 pressure treated baseboard. All pressure treated lumber to remain natural. * Construct a 6-ft workbench in shop area. * Install custom wood base cabinets on the rear and left side wall with a 36-inch pantry style on each end. * Exterior doors to remain. * Includes City of Port Richey building permit. Total: $9,250.00 To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. |
| Method of Procurement: Emergency procurement per Executive Order [s. 252.36(2), F.S.] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37504000259 - |
| Object Code and Description: 139900 - |
| Account Code: 37-20-2-675002-37500300-00-088040-25 |
| Split Amount: $9,250.00 |
|
|
|
2
|
Commercial and office building renovation and repair service
|
|
|
5750.0000
|
$1.0000
|
$5,750.00
|
| BL259007-OFFICE/BATHROOM REPAIRS - RECONSTRUCTION Contractor shall provide all labor, materials, equipment, supervision, and permitting to re-construct the Workshop at Werner Boyce Salt Springs Park ... |
| Line Item Description: BL259007-OFFICE/BATHROOM REPAIRS - RECONSTRUCTION Contractor shall provide all labor, materials, equipment, supervision, and permitting to re-construct the Workshop at Werner Boyce Salt Springs Park due to saltwater storm surge from Hurricane Helene as per attached proposal. * Reconstruct the interior finishings of these offices and bathroom. * Install R-13 insulation throughout the lower portion of walls. * Install new electrical outlets removing any water damaged outlets. * Install pressure treated plywood along the bottom 48-inch perimeter of all the exterior and interior walls. * Plywood to be screwed with galvanized screws. * Install a 1 x 6 pressure treated baseboard. * Reconstructing bathroom pedestal area removing toilet installing new toilet. * Replacing interior doors. * Caulk, prime and paint all light gray. * New interior door. Exterior doors to remain. * Includes City of Port Richey building permit. Total: $5,750.00 To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. |
| Method of Procurement: Emergency procurement per Executive Order [s. 252.36(2), F.S.] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37504000259 - |
| Object Code and Description: 139900 - |
| Account Code: 37-20-2-675002-37500300-00-088040-25 |
| Split Amount: $5,750.00 |
|
|
|
3
|
Commercial and office building renovation and repair service
|
|
|
5000.0000
|
$1.0000
|
$5,000.00
|
| Additional costs on cabinetry that went outside the original scope of work. BL259007 - WORKSHOP RECONSTRUCTION Contractor shall provide all labor, materials, equipment, supervision, and permitting t... |
| Line Item Description: Additional costs on cabinetry that went outside the original scope of work. BL259007 - WORKSHOP RECONSTRUCTION Contractor shall provide all labor, materials, equipment, supervision, and permitting to re-construct the Workshop at Werner Boyce Salt Springs State Park due to saltwater storm surge from Hurricane Helene as per attached per proposal. *Reconstruct the interior finishing of these offices and workshop areas. *Install R-13 insulation throughout the lower portion of walls. *Install new electrical outlets removing any water damaged outlets. *Install pressure treated plywood along the bottom 48-inch perimeter of all the exterior and interior walls. *Plywood to be screwed with galvanized screws. *Install a 1x6 pressure treated baseboard. *Replace interior doors. *Caulk, prime, and paint all light gray. *To include bathroom area. *Construct an 8-ft workbench in shop area. *Install custom wood base cabinets a 60-inch, 60-in, 144-in, and a 60-inch, along with a 12-ft countertop. *Exterior doors to remain. *Includes City of Port Richey permit. *Includes a custom 84-inch base cabinet and countertop matching existing upper cabinets with a stainless steel 36-inch brushed nickel faucet inline filter system and adding a hot water heater under cabinet. *Constructing plywood box storage area for shop matching previous existing work boxes okay. *Custom 60-inch Formica countertops matching desk in the two offices. Total: $19,194.00 To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event the services rendered are not deemed satisfactory, the Contractor shall re-perform the needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of contract. |
| Method of Procurement: Emergency procurement per Executive Order [s. 252.36(2), F.S.] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37504000259 - |
| Object Code and Description: 139900 - |
| Account Code: 37-20-2-675002-37500300-00-088040-25 |
| Split Amount: $5,000.00 |
|