| More |
LINE ITEM NUMBER
|
COMMODITY TYPE
|
STATE TERM CONTRACT ID
|
AGENCY SOLICITATION NUMBER
|
Quantity |
Unit Price |
Total Unit Price |
|
|
1
|
Electrical equipment maintenance and repair service
|
|
|
1.0000
|
$1,800.0000
|
$1,800.00
|
| Estimate 1611 - Project 1: Pole Barn Materials - Vendor to supply all material to have electric service installed at the Pole Barn located on the south side of the St. Sebastian River Preserve State... |
| Line Item Description: Estimate 1611 - Project 1: Pole Barn Materials - Vendor to supply all material to have electric service installed at the Pole Barn located on the south side of the St. Sebastian River Preserve State Park. Materials: Add a dedicated 120/240V, 50A circuits from existing panel to work shed into barn area. Install underground conduit and wiring. Add double pole, 50 a breaker. Install small 6 space outdoor rated sub panel on barn post. Terminate feeder circuit into new panel. Add 8 outlets in barn one at each post. GFCI Outlets will be weather resistant and outdoor rated bubble cover. Add 2 bay lights inside barn. Vendor to supply new fixtures and one outdoor switch near sub panel to control lights. Total cost for materials: $1,800.00 To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37503000023 - |
| Object Code and Description: 242072 - |
| Account Code: 37-20-2-675002-37500300-00-101198-00 |
| Split Amount: $1,800.00 |
|
|
|
2
|
Electrical equipment maintenance and repair service
|
|
|
1.0000
|
$5,000.0000
|
$5,000.00
|
| Estimate 1611 - Project 1: Pole Barn Vendor to supply all material to have electric service installed at the Pole Barn located on the south side of the St. Sebastian River Preserve State Park. Labo... |
| Line Item Description: Estimate 1611 - Project 1: Pole Barn Vendor to supply all material to have electric service installed at the Pole Barn located on the south side of the St. Sebastian River Preserve State Park. Labor: Labor to Add a dedicated 120/240V, 50A circuits from existing panel to work shed into barn area. Install underground conduit and wiring. Add double pole, 50 a breaker. Install small 6 space outdoor rated sub panel on barn post. Terminate feeder circuit into new panel. Add 8 outlets in barn one at each post. GFCI Outlets will be weather resistant and outdoor rated bubble cover. Add 2 bay lights inside barn. Vendor to supply new fixtures and one outdoor switch near sub panel to control lights. Total cost for Labor: $5,000.00 To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37503000023 - |
| Object Code and Description: 242072 - |
| Account Code: 37-20-2-675002-37500300-00-030000-00 |
| Split Amount: $5,000.00 |
|
|
|
3
|
Electrical equipment maintenance and repair service
|
|
|
1.0000
|
$7,900.0000
|
$7,900.00
|
| Estimate 1612 - Project 2: Herbicide & Well Sheds Labor: Vendor to provide materials for the following project: add dedicated 20/240V, 100 A circuit from existing panel inside work shed into herbicid... |
| Line Item Description: Estimate 1612 - Project 2: Herbicide & Well Sheds Labor: Vendor to provide materials for the following project: add dedicated 20/240V, 100 A circuit from existing panel inside work shed into herbicide shed. Install underground conduit and wiring. Add double pole, 100 A breaker in existing work shed Eaton panel. Install 100A rated sub panel at herbicide shed, outdoor rated, terminate feeder circuit into new panel. Add 6 outlets at the herbicide shed - one outlet at each of the three front posts and three outlets inside the main room. Demo the existing lighting and exposed wiring inside the herbicide room. add 5 light fixtures., on in each storage room, one inside the main room. Install switch to control all lights, to be located inside the main room. Add a dedicated 50 am circuit from herbicide shed to pump house. Install underground conduit and wiring from herbicide shed into pump house. Add sub panel inside pump house. Demo existing electrical inside pump house, including open splicers, exposed wire. Add switch near entry of the pump house. Install light fixture at the pump house. Install dedicated circuit and whip from sub panel into existing pump. install outlet in pump house. Park to open main trench from work shed into herbicide house between herbicide house and pump house. Vendor to supply all materials and labor for this project. -Cost to perform labor to complete the scope described above Total cost for Labor: $7,900.00 To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37503000023 - |
| Object Code and Description: 242072 - |
| Account Code: 37-20-2-675002-37500300-00-030000-00 |
| Split Amount: $7,900.00 |
|
|
|
4
|
Electrical equipment maintenance and repair service
|
|
|
1.0000
|
$5,200.0000
|
$5,200.00
|
| Estimate 1612 - Project 2: Herbicide & Well Sheds Vendor to provide materials for the following project: add dedicated 20/240V, 100 A circuit from existing panel inside work shed into herbicide shed... |
| Line Item Description: Estimate 1612 - Project 2: Herbicide & Well Sheds Vendor to provide materials for the following project: add dedicated 20/240V, 100 A circuit from existing panel inside work shed into herbicide shed. Install underground conduit and wiring. Add double pole, 100 A breaker in existing work shed Eaton panel. Install 100A rated sub panel at herbicide shed, outdoor rated, terminate feeder circuit into new panel. Add 6 outlets at the herbicide shed - one outlet at each of the three front posts and three outlets inside the main room. Demo the existing lighting and exposed wiring inside the herbicide room. add 5 light fixtures., on in each storage room, one inside the main room. Install switch to control all lights, to be located inside the main room. Add a dedicated 50 am circuit from herbicide shed to pump house. Install underground conduit and wiring from herbicide shed into pump house. Add sub panel inside pump house. Demo existing electrical inside pump house, including open splicers, exposed wire. Add switch near entry of the pump house. Install light fixture at the pump house. Install dedicated circuit and whip from sub panel into existing pump. install outlet in pump house. Park to open main trench from work shed into herbicide house between herbicide house and pump house. Vendor to supply all materials and labor for this project. Cost for Materials --Cost to furnish the material to complete the scope described above $5,200.00 Total cost for Materials: $5,200.00 To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37503000023 - |
| Object Code and Description: 242072 - |
| Account Code: 37-20-2-675002-37500300-00-101198-00 |
| Split Amount: $5,200.00 |
|