1
|
Demolition services
|
|
|
1.0000
|
$5,875.0000
|
$5,875.00
|
| CCI Construction proposes to furnish all labor, equipment, transportation, and disposal necessary to complete the demolition and removal of the existing utility shed located at Sebastian Inlet State P... |
| Line Item Description: CCI Construction proposes to furnish all labor, equipment, transportation, and disposal necessary to complete the demolition and removal of the existing utility shed located at Sebastian Inlet State Park. Scope Includes: Mobilization to project site Site protection and work area preparation Demolition and removal of existing utility shed structure Loading and hauling of demolition debris Dump fees and disposal costs Trucking and transportation of debris/materials Heavy equipment operation required for demolition and removal Manual hand labor required for demolition, cleanup and loading Final cleanup of work area related to demolition operations Project Pricing: Materials $5,875.00 Labor, Heavy equipment operation & hand labor $5,875.00 Total cost $5,875.00 + $5,875.00 = $11,750.00 Payment Terms 50% deposit due upon acceptance for materials Remaining balance due upon completion of work Total deposit for materials : $5,875.00 Advance payments are authorized under s. 215.422(15), F.S. and are allowable as the goods or services; are essential to the operation of a state agency; savings are greater than investment earnings; and are available only if advance payment is made. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37503000072 - |
| Object Code and Description: 320000 - |
| Account Code: 37-20-2-675002-37500300-00-040000-00 |
| Split Amount: $5,875.00 |
|
|
|
2
|
Demolition services
|
|
|
1.0000
|
$5,875.0000
|
$5,875.00
|
| CCI Construction proposes to furnish all labor, equipment, transportation, and disposal necessary to complete the demolition and removal of the existing utility shed located at Sebastian Inlet State P... |
| Line Item Description: CCI Construction proposes to furnish all labor, equipment, transportation, and disposal necessary to complete the demolition and removal of the existing utility shed located at Sebastian Inlet State Park. Scope Includes: Mobilization to project site Site protection and work area preparation Demolition and removal of existing utility shed structure Loading and hauling of demolition debris Dump fees and disposal costs Trucking and transportation of debris/materials Heavy equipment operation required for demolition and removal Manual hand labor required for demolition, cleanup and loading Final cleanup of work area related to demolition operations Project Pricing Materials $5,875.00 Labor, Heavy equipment operation & hand labor $5,875.00 Total cost $5,875.00 + $5,875.00 = $11,750.00 Payment Terms 50% deposit due upon acceptance for materials Remaining balance due upon completion of work Total Price: $5,875.00 To be paid upon completion of services, DEP acceptance, and receipt of itemized invoice. Partial payments allowed. In the event that services rendered are not deemed satisfactory, the Contractor shall re-perform the work needed to ensure satisfactory service, at no additional cost to the Department. Failure to provide all services, or failure to provide services which are satisfactory, shall result in non-payment or termination of the Contract. |
| Method of Procurement: Informally quoted purchase not exceeding Category Two [Rule 60A-1.002(3), F.A.C. & s. 287.017(2)] |
Line Split Details:
| Split Accounting Line Number: 1 |
| FLAIR Contract ID: |
| Org. Code and Description: 37503000072 - |
| Object Code and Description: 139900 - |
| Account Code: 37-20-2-675002-37500300-00-030000-00 |
| Split Amount: $5,875.00 |
|